Phelps v. State Water Resources Control Bd.
Filed 10/29/07 Phelps v. State Water Resources Control Bd. CA3
NOT TO BE PUBLISHED
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
THIRD APPELLATE DISTRICT
(Sacramento)
----
LLOYD L. PHELPS, JR. et al., Plaintiffs and Appellants, v. STATE WATER RESOURCES CONTROL BOARD et al., Defendants and Respondents; DEPARTMENT OF WATER RESOURCES et al., Real Parties in Interest and Respondents. | C052770 (Super. Ct. No. 04CS00368) |
Plaintiffs Lloyd L. Phelps, Jr., Gary Phelps, Joey P. Ratto, Jr., and Ronald D. Conn farm land on Upper Roberts Island in the Sacramento-San Joaquin Delta (Delta) under licenses issued by defendant State Water Resources Control Board (SWRCB). The SWRCB imposed civil penalties against plaintiffs pursuant to Water Code section 1052 for unauthorized diversion of water in 2000 and 2001.[1] (State Water Resources Control Bd. Order No. WRO 2004-0004, adopted Feb. 19, 2004 (Order WRO 2004-0004).) Plaintiffs filed a petition for writ of mandate and complaint for declaratory relief which challenged Order WRO 2004-0004 on numerous grounds.[2]The court denied all requested relief and plaintiffs appeal. We conclude most of plaintiffs claims are time-barred under Water Code section 1126, and the courts other findings are supported by substantial evidence. We therefore affirm the judgment.
BACKGROUND
A. The Delta Watershed:
The SWRCB describes the Delta watershed as the largest watershed in California. . . . [T]he Sacramento River and the San Joaquin Rivers [sic] flow into the Delta. The outflow from the Delta flows into Suisun Bay and then into San Francisco Bay. [] [T]he availability of water throughout the Delta watershed is generally affected by the demand for water of suitable quality within the Delta and Suisun Marsh. Without adequate freshwater outflow from the Delta into Suisun Bay, seawater intrudes into the Delta and degrades water quality. High salinity and low Delta outflows can be harmful to agricultural production, municipal and industrial uses of water, and to various species of fish and wildlife throughout the Bay-Delta estuary. (In re Water Right Permits in the Sacramento-San Joaquin Delta Watershed (Nov. 1983) State Water Resources Control Bd. Dec. No. 1594 at p. 2 (Decision 1594).)
Under authority granted in sections 1253 and 1394, the SWRCB included standard Water Right Permit Term 80 (Term 80) in over 500 permits for diversion within the Delta watershed.[3] As originally drafted, Term 80 read: The State Water Resources Control Board reserves jurisdiction over this permit for the purpose of conforming the season of diversion to later findings of the Board on prior applications involving water in the Sacramento River Basin and Delta. Action by the Board will be taken only after notice to interested parties and opportunity for hearing. (Decision 1594 at p. 4.)
The Central Valley Project (CVP) operated by the [U.S.] Bureau of Reclamation (USBR) and the State Water Project (SWP) operated by the [real party in interest DWR] substantially alter flows within the Delta watershed. . . . [] . . . [] The Projects[[4]] store winter and spring runoff and then release and transport it to satisfy demands within the Sacramento River Basin, San Joaquin Basin, Tulare Basin, San Francisco Bay Area communities and Southern California communities. (Decision 1594 at pp. 4-5.)
In 1978, the SWRCB required the USBR and DWR to meet specified water quality standards in the Delta and Suisun Marsh. . . . The effect of the standards [was] to require the Projects to release water from storage or to curtail diversions when the flow entering the Delta would otherwise be insufficient to meet the water quality standards. (Decision 1594 at p. 7, citing In re Permit 12720 (Application 5625) and other Permits of United States Bureau of Reclamation, etc. (Aug. 16, 1978) State Water Resources Control Bd. Dec. No. 1485 at p. 10 (Decision 1485).) Up to that date, the Board [had] made no general effort to regulate water users season of diversion on a real-time basis. Permits were issued for a fixed season of diversion with the understanding that water [might] not always be available to a later permittee after satisfying the rights of riparians and earlier appropriators. (Decision 1594 at p. 25.)
B. Water Right Permit Term 91:
After the SWRCB adopted Decision 1485, the USBR and the DWR protested numerous water right applications within the Delta watershed. The protests were based on claims by the [USBR] and the [DWR] that diversion by new applicants at certain times would force the Projects to release more stored water to meet the Delta water quality standards established by Decision 1485. As an interim solution to the problem, the Board adopted Standard Water Right Permit Term 91 (Term 91) on March 25, 1980, thereby allowing the SWRCB to process new water right applications pending development of a long-term method for determining when water was available for appropriation.[5] (Id. at pp. 8-9.) After 1985, the SWRCB included Term 91 in nearly all water right permits and licenses issued as an original permit term or through amendment. (Id. at pp. 8-9, 35-36; State Water Resources Control Bd. Order WR 84-2 (Order WR 84-2, pp. 57-58.)
Term 91 provides:
No diversion is authorized by this permit when satisfaction of inbasin entitlements requires release of supplemental Project water by the Central Valley Project or the State Water Project.
a. Inbasin entitlements are defined as rights to divert water from streams tributary to the Sacramento-San Joaquin Delta or the Delta for use within the respective basins of origin or the Legal Delta, unavoidable natural requirements for riparian habitat and conveyance losses, and flows required by the Board for maintenance of water quality and fish and wildlife. Export diversions and Project carriage water are specifically excluded from the definition of inbasin entitlements.
b. Supplemental Project water is defined as water imported to the basin by the Projects, and water released from Project storage, which is in excess of export diversions, Project carriage water, and Project inbasin deliveries.
The Board shall notify the permittee of curtailment of diversion under this term after it finds that supplemental Project water has been released or will be released. The Board will advise the permittee of the probability of imminent curtailment of diversion as far in advance as practicable based on anticipated requirements for supplemental Project water provided by the Project operators. (Order WR 84-2 at pp. 57-58.)
In 1983, the SWRCB approved the real-time method of calculation and implementation of Term 91 set forth in State Water Resources Control Board Order WR 81-15 (Order WR 81-15). (Order WR 84-2 at pp. 60, 61; Order WR 81-15 at pp. 1, 5-8.)[6]It found that in view of the small quantity of water involved, it [was] inefficient to establish real-time regulation of hundreds of parties diverting small quantities of water. (Decision 1594 at p. 27.) Accordingly, the SWRCB applied the Term 91 method of calculating water availability only to those Term 80 permits which authorize[d] direct diversion at a rate of 1.0 cfs or more or which authorize[d] diversion to storage of 100 AF per year or more.[7] (Ibid.; Order WR 84-2 at pp. 58-59.)
C. Notice to Plaintiffs:
Pursuant to Decision 1594 and Order WR 84-2, the SWRCB included Term 91 in the four water right permits issued to plaintiffs in 1985. Thereafter, the SWRCB issued licenses to the two Phelpses (1996 and 1999),[8]Ratto (1995), and Conn (1998). Each water right license included Term 91. None of the plaintiffs challenged the SWRCBs inclusion of Term 91 in his permit or license.
On June 28, 2000, the SWRCB sent plaintiffs a document entitled Notice of Curtailment of Water Diversion During 2000. The first paragraph read:
Your permit or license for the appropriative water right identified by the application number on the mailing label above, contains a term (Standard Term 91) that prohibits diversion of water when satisfaction of inbasin entitlements requires release of stored water (supplemental Project water) by the Central Valley Project of the State Water Project. You are hereby notified that the State Water Resources Control Board has determined that supplemental Project water is being released in the Sacramento-San Joaquin Delta Watershed. (Italics added.)
The second paragraph stated in large, bold type:
YOU MUST IMMEDIATELY DISCONTINUE WATER DIVERSION UNDER THE SPECIFIED APPROPRIATIVE WATER RIGHT FROM THE DATE OF RECEIPT OF THIS NOTICE THROUGH AUGUST 31, 2000, UNLESS NOTIFIED EARLIER.
The notice also explained that failure to comply with the notice of curtailment could result in imposition of administrative civil liability, including monetary penalties not to exceed $500 per day . . . .
The SWRCB sent plaintiffs a second set of curtailment notices on June 4, 2001. The notices directed plaintiffs to immediately discontinue water diversion through August 31, 2001. At no time did plaintiffs challenge the 2000 and 2001 notices of curtailment.
On July 2, 2002, the chief of the SWRCBs Division of Water Rights (Division) sent plaintiffs separate administrative civil liability complaints pursuant to section 1055.[9] The complaints charged plaintiffs with the unauthorized diversion of water during the 2000 and 2001 Term 91 curtailment periods. The chief proposed civil liability in the following amounts: Phelps -- $22,500 out of a potential maximum of $138,000; Ratto -- $3,750 out of a potential maximum of $69,000; and Conn and Ron Silva -- $14,250 out of a potential maximum of $69,000. On plaintiffs request, the SWRCB set a public hearing on January 14, 2003, on the complaints for civil liability. After hearing, the SWRCB issued Order No. WRO 2004-0004 on February 19, 2004, imposing civil penalties of $45,000 against the Phelpses, $7,000 against Ratto, and $10,000 against Conn.
DISCUSSION
I.
Standard of Review
Code of Civil Procedure section 1094.5 governs judicial review of water right orders issued by the SWRCB. ( 1126, subds. (b) & (c).) The trial courts inquiry in such a challenge shall extend to the questions whether the [SWRCB] has proceeded without, or in excess of jurisdiction; whether there was a fair trial; and whether there was any prejudicial abuse of discretion. Abuse of discretion is established if the [SWRCB] has not proceeded in the manner required by law, the order or decision is not supported by the findings, or the findings are not supported by the evidence. [] [W]here it is claimed that the findings are not supported by the evidence, in cases in which the court is authorized by law to exercise its independent judgment on the evidence, abuse of discretion is established if the court determines that the findings are not supported by the weight of the evidence. In all other cases, abuse of discretion is established if the court determines that the findings are not supported by substantial evidence in the light of the whole record. (Code Civ. Proc., 1094.5, subd. (b) & (c).)
On appeal from a judgment denying a petition for writ of mandate under Code of Civil Procedure section 1094.5, we review[] the record as a whole to determine whether the trial courts findings are supported by substantial evidence. (Hall v. Court Reporters Bd. of California(2002) 98 Cal.App.4th 633, 637 (Hall).) In this context, the word substantial . . . clearly implies that such evidence must be of ponderable legal significance. Obviously the word cannot be deemed synonymous with any evidence. It must be reasonable in nature, credible, and of solid value . . . . (DiMartino v. City of Orinda (2000) 80 Cal.App.4th 329, 336.) The testimony of a single witness can constitute substantial evidence. (In re Marriage of Mix (1975) 14 Cal.3d 604, 614.)
If plaintiffs contend that some particular issue of fact is not sustained, they are required to set forth in their brief all the material evidence on the point and not merely their own evidence. Unless this is done the error is deemed to be waived. (State Water Resources Control Bd. Cases (2006) 136 Cal.App.4th 674, 749 (SWRCB Cases).)
We independently review questions of law, ‛giving deference to the determination of the agency appropriate to the circumstances of the agency action. [Citation.] (Yamaha Corp. of America v. State Bd. of Equalization (1998) 19 Cal.4th 1, 78.)
II.
Plaintiffs Challenges To Term 91 Are Time-Barred
Plaintiffs challenge the SWRCBs imposition of Term 91 diversion restrictions on grounds that:
(1) The SWRCB abused its discretion by imposing the restrictions without determining that the restrictions would achieve the purpose for which they were imposed, that is, without making adequate water quality findings;
(2) The SWRCBs implementation of the diversion restrictions deprived plaintiffs of their rights under the Watershed Protection Act ( 11460 11463);
(3) The SWRCBs implementation of the diversion restrictions deprived plaintiffs of their rights under the Delta Protection Act ( 12200 12205 (DPA));
(4) The SWRCBs implementation of the diversion restrictions deprived plaintiffs of their first in time, first in right seniority over Project water rights; and
(5) The SWRCB based implementation of the diversion restrictions on wrongfully substituted Delta outflow standards. (Capitalization omitted.)
We conclude plaintiffs failure to challenge imposition of Term 91 on these grounds within the time period set forth in section 1126, subdivision (b) bars judicial review of the issues.
Section 1126, subdivision (b) provides: Any party aggrieved by any decision or order may, not later than 30 days from the date of final action by the board, file a petition for a writ of mandate for review of the decision or order. Except in cases where the decision or order is issued under authority delegated to an officer or employee of the board, reconsideration before the board is not an administrative remedy that is required to be exhausted before filing a petition for writ of mandate. Subdivision (d) bars judicial review of the SWRCB decision or order [i]f no aggrieved party petitions for a writ of mandate within the time provided by this section . . . .
The court applied section 1126, subdivision (b) in North Gualala Water Co. v. State Water Resources Control Board (2006) 139 Cal.App.4th 1577, a challenge to the SWRCBs jurisdiction to compel the company to obtain a permit to pump ground water. (Id. at p. 1580.) The court held that the company waived its challenge to the SWRCBs interpretation of a term contained in its existing permit by failing to raise the issue within 30 days of the SWRCBs issuance of orders premised on the disputed interpretation. (Id. at pp. 1606-1607.) The court explained that the company could not, consistent with section 1126, manifest its acceptance of the conditions [placed on the new permit] and then wait until nearly two years later to challenge the premise on which they were self-evidently based. (Id. at p. 1607; see also County of Imperial v. McDougal (1977) 19 Cal.3d 505, 511 [challenge barred if landowner has acquiesced therein by either specifically agreeing to the [challenged] condition or failing to challenge its validity, and accepted the benefits afforded by the permit].)
In this case, plaintiffs had four opportunities to challenge the SWRCBs decision to include Term 91 in their permits and licenses before the SWRCB imposed civil penalties in 2002. First, plaintiffs could have raised the arguments when the SWRCB included Term 91 in the permits issued in 1985 pursuant to Decision 1594 and Order WR 84-2. Second, plaintiffs could have raised these arguments when the SWRCB included Term 91 in the licenses it issued to plaintiffs between 1995 and 1998. Third, plaintiffs could have challenged the 2000 notices of curtailment of water diversion they received in June 2000. Fourth, they could have challenged the 2001 notices of curtailment of water diversion they received in July 2001. Plaintiffs raised these issues for the first time at the hearing on the SWRCBs complaints for administrative civil liability which resulted in Order WRO 2004-0004.
On appeal, plaintiffs repeat the arguments made in the trial court that they were not required to comply with section 1126, subdivision (b) at any time before the SWRCB served the complaints against them for administrative civil liability. There is no merit in plaintiffs arguments.
A. Challenge To Issuance of Permits and Licenses:
Plaintiffs characterize their arguments as as applied rather than facial challenges to implementation of Term 91. Plaintiffs maintain that their challenges to the SWRCBs action were not ripe for review until the chief of the Division of Water Rights (Division) exercised his discretion to interpret and apply Term 91 to them during the summers of 2000 and 2001. Citing Evidence Code section 500,[10]they also contend that it was the SWRCBs burden to demonstrate that notwithstanding the authority, i.e., discretion, afforded by WR 81-15, on its face, Term 91 nevertheless inevitably pose[s] a present total and fatal conflict with the Watershed Protection Statute, Delta Protection Act and Rule of Priority and that there is no future hypothetical situation under which Term 91 could be applied consistent with those laws. We are not persuaded by plaintiffs attempt to circumvent the section 1126 time bar by creating a false distinction between a facial and as applied challenge to Term 91.
At the hearing on plaintiffs petition for writ of mandate, the parties acknowledged that the existence of the claimed distinction between a facial and as applied challenge to Term 91 turned on the scope of discretion granted to the chief of the Division under Order WR 81-15. Findings 17, 18 and 19 of Order WR 81-15 delegated the following aspects of Term 91s implementation to the chief of the Division:
17. In order to allow for timely implementation under Term 91, authority to review technical data, determine compliance with the conditions in Finding 12 herein [whether supplemental water and other conditions exist], decide whether to implement Term 91, and notify appropriators of the begining [sic] and ending of diversion restrictions will be delegated to the Chief, Division of Water Rights.
18. As experience with the operation of Term 91 is gained, additional exceptions to the use of the term in permits and licenses may be indicated. The Chief, Division of Water Rights will be granted authority to institute such exceptions after providing opportunity for SWRCB comment.
19. Experience may also indicate that there are short periods of time when it would be impractical to implement the diversion restrictions in Term 91 in spite of compliance with the conditions set forth in Finding 12 herein. The delegation of authority to the Chief, Division of Water Rights will include authority to determine such situations.
The court requested supplemental declarations that put[] forth with more clarity how [the Term 91] formula is actually used and how the discretion, if any, aside from additional exceptions, aside from this short time frame neither of which were applicable or relevant to this particular lawsuit, how it is used. [] Is there any judgment involved in the determination of carriage water; or is that just addition of these eighteen variables that are put forth in the reports . . . .
The SWRCB submitted the declaration of John OHagan, a supervising water resource control engineer with the Division which described how the Division used mathematical formulas to determine whether the Term 91 criteria were satisfied. In OHagans opinion, the chief exercised no discretion in the calculation of the carriage water value or the supplemental Project water value. Plaintiffs offered no evidence to contradict OHagans declaration.
The trial court found that Order WR 81-15 and Decision 1594 provided detailed formulas, specific definitions and precise directions for the chief of [the Boards] division of water rights to use in calculating when the conditions for implementing diversions under Term 91 have been triggered, in deciding whether to implement Term 91, and in notifying Term 91 permittees and licensees about the beginning and end of diversion curtailments. Order WR 81-15 and Decision 1594 left virtually no issue regarding Term 91 language, policy objectives or methods of calculation to the discretion of the chief in implementing Term 91 curtailments in individuals cases.
Based on our independent review, we conclude that Order WR 81-15 and Decision 1594 cannot, in this case, be read to grant the chief of the Division broad discretion in the implementation of Term 91. The discretionary language in paragraphs 18 and 19 of Order WR 81-15 refers to situations inapplicable to plaintiffs. We also conclude that the record supports the trial courts factual findings regarding the non-discretionary manner in which the chief implemented paragraph 17 by utilizing the formulas set forth in Order WR 81-15 and Decision 1594.[11]
We also reject plaintiffs argument that their claims were not ripe for review when the SWRCB issued the permits and licenses which contained Term 91. The ripeness requirement, a branch of the doctrine of justiciability, prevents courts from issuing purely advisory opinions. [Citation.] It is rooted in the fundamental concept that the proper role of the judiciary does not extend to the resolution of abstract differences of legal opinion. . . . [T]he ripeness doctrine is primarily bottomed on the recognition that judicial decisionmaking is best conducted in the context of an actual set of facts so that the issues will be framed with sufficient definiteness to enable the court to make a decree finally disposing of the controversy. (Pacific Legal Foundation v. California Coastal Com. (1982) 33 Cal.3d 158, 170.)
Consistent with the ripeness doctrine, section 1126, subdivision (b) applies to [a]ny party aggrieved by any decision or order . . . . (Italics added.) In other words, where an agency applies regulations to a partys injury, a sufficient controversy exists to satisfy the ripeness requirement. (Coral Construction, Inc. v. City and County of San Francisco (2004) 116 Cal.App.4th 6, 26 [specific application of the challenged ordinance to a bid submitted by construction company was sufficient injury].) Here, plaintiffs were aggrieved by the inclusion of Term 91 in their permits and licenses because it gave the SWRCB the authority to order curtailment of water diversions for additional periods based on real-time assessment of water availability.
B. Challenge To Issuance of Curtailment Notices:
Plaintiffs contend they were not required to raise their challenge to the implementation of Term 91 at the time the curtailment notices were issued because the notices were merely notices of potential future violations. Citing Western Surgical Supply Co. v. Affleck (1952) 110 Cal.App.2d 388 (Western Surgical), they argue that mere notice of violation does not constitute an agencys enforcement of an order giving rise to a mandate proceeding. Plaintiffs assert, it was not until approximately a year to two years subsequent to these notices that [plaintiffs] were for the first time put on notice of, and charged with, an actual violation of Term 91.
Plaintiffs lack of notice argument ignores the unequivocal language of the curtailment notices which informed plaintiffs that they MUST IMMEDIATELY DISCONTINUE WATER DIVERSION UNDER THE SPECIFIED APPROPRIATIVE WATER RIGHT FROM THE DATE OF RECEIPT OF THIS NOTICE THROUGH AUGUST 31, 2000, UNLESS NOTIFIED EARLIER. We conclude plaintiffs were clearly aggrieved by the curtailment notice within the meaning of section 1126, subdivision (b) because it required plaintiffs to immediately discontinue diversion of water under their licenses. Implementation of Term 91 was ripe for challenge upon plaintiffs receipt of the curtailment notices in June 2000.
Plaintiffs reliance on Western Surgical is misplaced. In that case, a wholesale distributor of drugs and medical supplies filed a petition for writ of mandate to restrain the State Board of Pharmacy from enforcing certain regulations and orders at a time when misdemeanor criminal complaints were pending in connection with the same violations. However, the Board of Pharmacy had taken no action to enforce the administrative notices of violations. (Western Surgical, supra, 110 Cal.App.2d at pp. 389-390.) The court denied the petition on grounds there was nothing to review (id. at p. 391) and a determination as to the validity of the statutes involved would amount to an unwarranted interference with the criminal proceedings now pending in the municipal courts. (Id. at p. 393.) Here, there were no pending proceedings, criminal or otherwise, to delay enforcement of Term 91 upon notice of curtailment.
Next, we reject plaintiffs claim that Code of Civil Procedure section 1094.5[12]is inapplicable to judicial review of the curtailment notices because section 1123[13]authorizes, but does not mandate, the SWRCB to hold a hearing on a petition for reconsideration of SWRCB action. Section 1126, subdivision (c) states that, [s]ection 1094.5 of the Code of Civil Procedure shall govern judicial proceedings under this section. (Italics added.) This language read in conjunction with section 1126, subdivision (a) [It is the intent of the Legislature that all issues relating to state water law decided by the board be reviewed in state courts . . . .], indicates the Legislatures intent that section 1094.5 govern judicial review of all cases relating to state water law. Nothing in subdivision (b) of section 1126 limits the type of proceeding subject to judicial review. We therefore conclude that judicial review is not limited to proceedings in which by law a hearing is required. (Code. Civ. Proc., 1094.5, subd. (a).)
Plaintiffs offer no support for their argument that the curtailment notices do not constitute a final action by the SWRCB and therefore are not subject to judicial review. As we stated, the notices are unequivocal in directing plaintiffs to immediately stop diverting water pursuant to Term 91. Section 1126, subdivision (b) provides judicial review for [a]ny party aggrieved by any decision or order . . . . (Italics added.) Plaintiffs exhaustion of remedies argument is irrelevant because the SWRCB does not challenge plaintiffs petition on that ground.
Finally, plaintiffs argue that even if their challenges to implementation of Term 91 are barred under section 1126, subdivision (b), the issues are ripe for declaratory relief. Section 1126, subdivision (d) states that failure to file a timely writ of mandate means that the challenged order is not subject to review by any court. Where, as here, the Legislature has designated a remedy by which to review an administrative action, declaratory relief is unavailable. (County of Los Angeles v. State Water Resources Control Bd. (2006) 143 Cal.App.4th 985, 1002.)
C. The Merits of Plaintiffs Term 91 Claims:
Having concluded plaintiffs challenges to Term 91 are time-barred, we also explain why there is no merit in plaintiffs substantive claims as a matter of law.
1. Water Quality Findings:
Plaintiffs argue that before imposing the Term 91 curtailments, the SWRCB was required to make an express finding that plaintiffs diversions would cause the Projects to release storage water to offset the impact of plaintiffs diversions on water quality in the Delta. Plaintiffs also maintain that imposition of Term 91 was not warranted because reclamation and farming of [plaintiffs] lands [by plaintiffs and their predecessors] . . . actually resulted in substantial water savings to the Projects.
Before the adoption of Term 91, as an interim measure in 1978, the SWRCB did not attempt to regulate permittees season of diversion on a real-time basis. As late as 1983, it simply excluded the months of July and August from the season of diversion in all Term 80 permits. In some areas, the Board excluded additional periods of time where necessary for protection of local prior rights, fish flow requirements and other restrictions imposed by adjudication. (Decision 1594 at p. 25.) There is no indication the SWRCB conditioned imposition of this two-month curtailment on whether diversion by a particular permittee might impact local prior rights, fish flow requirements and other restrictions . . . . (Ibid.)
In Decision 1594, the SWRCB concluded that it was appropriate for Term 80 permittees to share responsibility with the Projects in meeting all Delta water quality standards whether based on protection of agricultural uses, municipal and industrial uses, or fish and wildlife and other public interest requirements. (Decision 1594 at pp. 9, 35.) It also found that [d]ue to the wide variation in water availability from year to year, a real-time procedure [such as that provided by Term 91] allow[ed] for more efficient utilization of water supplies when they [were] available and better protection of prior rights when water supplies [were] scarce. (Id. at pp. 12, 22 & 24.) Balancing the need for efficient administration with the policy of shared responsibility, the SWRCB found that it was inefficient to establish real-time regulation of hundreds of parties diverting small quantities of water and applied the Term 91 method of determining water availability only to those Term 80 permits which authorize[d] direct diversion at a rate of 1.0 cfs or more or which authorize[d] diversion to storage of 100 AF per year or more.[14](Decision 1594 at p. 27.) Nothing in Decision 1594 or Order WR 84-2 suggests the SWRCB intended to condition imposition of Term 91 on the possible impact of a particular permittees or licensees diversion on water quality during the curtailment period. Indeed, such a procedure appears contrary to real-time calculation of available water. In any event, we will not read a causation requirement into the Term 91 narrative formula or mathematical equations in the absence of a showing that the SWRCB so intended.
2. Rights Under the Watershed Protection Act (WPA):
Plaintiffs argue that Term 91 deprived them of their right to use water from their own watershed, that is, the Delta, in violation of section 11460. They also assert that they were not required to pay the Projects for water in order to exercise their rights under the WPA. Plaintiffs arguments conflict with well-established principles of water rights law.
At the same time that the Legislature established the CVP in 1933, it enacted a provision which later became known as the Watershed Protection Act ( 11460-11463). (El Dorado Irrigation Dist. v. State Water Resources Control Bd. (2006) 142 Cal.App.4th 937, 947 (El Dorado); United States v. State Water Resources Control Bd. (1986) 182 Cal.App.3d 82, 138.) Section 11460 provides: In the construction and operation by the department of any project under the provisions of this part a watershed or area wherein water originates, or an area immediately adjacent thereto which can conveniently be supplied with water therefrom, shall not be deprived by the department directly or indirectly of the prior right to all of the water reasonably required to adequately supply the beneficial needs of the watershed, area, or any of the inhabitants or property owners therein. Section 11460 applies to the operation of the SWP by the DWR and the operation of the CVP by the USBR. ( 2 & 11128; United States v. State Water Resources Control Bd., supra, at pp. 138-139; see also El Dorado, supra, at p. 976; SWRCB Cases, supra, 136 Cal.App.4th at p. 758.)
Order WRO 2004-0004, the SWRCB decision at issue here, described the impact of Term 91 on water right permittees and licensees when the Projects store and release water. Term 91 is based on the assumption that the water rights of the DWR and the USBR to appropriate uncontrolled flows for export from the southern Delta are junior to all other water rights in the watershed. The water stored upstream by the DWR and the USBR during periods of excess flow, however, is appropriated at times when its appropriation does not injure any other water right holders. When this water is subsequently released from the reservoirs to flow downstream to the export facilities, it is already appropriated, and is not naturally present in the rivers.Water that is appropriated and is flowing in a channel under the control of its appropriator is not subject to appropriation by others. [Citation.] Accordingly, the stored water transported through the rivers to the export pumps by the projects is not available for others to appropriate. It also is not available to riparian right holders, since it is not natural flow. (Italics added.)
We affirmed this reading of the WPA in El Dorado, supra, 142 Cal.App.4th at page 976, which involved a challenge to the SWRCBs inclusion of Term 91 in the irrigation districts permit to appropriate water from the South Fork of the American River. We explained that although [the irrigation district] may be entitled to assert a priority under section 11460 over the USBR and the [DWR] to the diversion of water originating in the watershed of the South Fork of the American River, that priority does not extend to water the projects have properly diverted to storage at an earlier date. If [the irrigation district] wants water properly stored by the projects, it must pay for it. (Id. at p. 976.) Although we affirmed the trial courts judgment against the SWRCB on the ground that its inclusion of Term 91 in the irrigation districts permit violated the rule of priority, we expressly held that the area of origin statutes did not justify the trial courts decision to invalidate the inclusion of Term 91 in the permit. (Ibid.)
The SWRCBs interpretation of the impact of Term 91 on diversion of already appropriated water is consistent with section 11462, which provides that [t]he provisions of [the WPA] shall not be so construed as to create any new property rights other than against the department as provided in this part or to require the department to furnish to any person without adequate compensation therefor any water made available by the construction of any works by the department. (Italics added.)
Plaintiffs maintain that under the WPA, the SWRCB should not authorize Term 91 diversion curtailments when Project activity is responsible for degrading water quality. Plaintiffs contend that the SWRCB should authorize diversion curtailments only where plaintiffs diversions affect water quality. They argue that [t]o the extent the Delta water quality standards would still be impaired even if the Projects halted all of their operations and removed all constructed works which impair those standards, then the [Board] would next have to quantify how much impairment of those standards is caused by [plaintiffs] diversions made during those curtailment periods. [] Once the foregoing [was] quantified, the [Board] would then have to quantify how much stored water the Projects[] must release to offset [plaintiffs] impairment of those standards. This court already rejected this claim in the context of stored water releases from New Melones Reservoir for the purpose of meeting downstream water quality objectives:
Section 11460 is not concerned with why a particular beneficial need for water exists within the area of origin. For example, it does not matter why there is excess salinity at Vernalis or why there is reduced outflow from the Delta. What matters is that these conditions exist, they have adverse impacts on beneficial uses of water in the Delta, and releases from New Melones can be used to mitigate those impacts. To the extent water from New Melones is being used for those purposes, it is being used to supply the beneficial needs of the area of origin, and the San Joaquin County parties cannot assert any priority to that water under section 11460 for their consumptive use of the water. Even if more New Melones water might be available for consumptive use by the San Joaquin County parties if the [USBR] found other ways to mitigate the adverse impacts of exports on the Delta, that does not mean the [USBR] is violating section 11460 by using New Melones water to mitigate those impacts. (SWRCB Cases, supra, 136 Cal.App.4th at pp. 759-760, fn. omitted.)
Based on the foregoing authority, we conclude that the WPA does not bar enforcement of Term 91 against plaintiffs.
3. Rights Under the Delta Protection Act:
Plaintiffs argue that implementation of Term 91 deprived them of their rights under the Delta Protection Act (DPA) to divert Delta water. They maintain that the Projects have a statutory duty under section 12202 to provide for salinity control and an adequate water supply in the Delta without compensation by plaintiffs. Contrary to plaintiffs argument, nothing in the language of the DPA gives plaintiffs a new right to divert water in the Delta or entitlement to Project water without paying for it.
Sections 12200 through 12205 are commonly known as the Delta Protection Act. (SWRCB Cases, supra, 136 Cal.App.4th at p. 767.) Section 12201 sets forth the Legislatures dual goals in maintaining: (1) an adequate water supply in the Delta sufficient to maintain and expand agriculture, industry, urban, and recreational development in the Delta; and (2) a common source of fresh water for export to areas of water deficiency is necessary to the peace, health, safety and welfare of the people of the State. (SWRCB Cases. supra, at p. 767.) The DPA gives preference to the first goal of salinity control by providing that no one may divert water from the Delta that is necessary for salinity control or to provide an adequate water supply for users within the Delta. (Id. at p. 768; see 12202, 12203 & 12204.)
The SWRCB explained in the challenged Order WRO 2004-0004 that [n]o provision in the Delta Protection Act accords a water right to users of water in the Delta. . . . [Plaintiffs] must have adequate existing water rights, acquired under the laws that govern acquisition of water rights, before they can divert and use water from the channels of the Delta. If existing water rights are not adequate to supply the needs of in-Delta water users, the Delta Protection Act does not ensure the Delta water users an adequate supply. The in-Delta water users can, however, make arrangements with [the] DWR and pay adequate compensation to the DWR for the water, pursuant to Water Code section 11462. (Order WRO 2004-0004 at p. 20.) The SWRCB continued: Stored water that DWR releases into the Delta when Term 91 is in effect . . . water made available by the construction of DWRs Oroville Reservoir. Accordingly, if the Delta water users adequately compensate DWR, they can take water attributable to DWRs storage releases from the Delta when Term 91 is in effect. (Id. at p. 21, italics added.)
We begin by rejecting plaintiffs argument that the Projects are under a statutory mandate to provide them with Delta water without compensation. Section 12202 reads in relevant part: Among the functions to be provided by the State Water Resources Development System, in coordination with the activities of the United States in providing salinity control for the Delta through operation of the Federal Central Valley Project, shall be the provision of salinity control and an adequate water supply for the users of water in the Sacramento-San Joaquin Delta. If it is determined to be in the public interest to provide a substitute water supply to the users in said Delta in lieu of that which would be provided as a result of salinity control no added financial burden shall be placed upon said Delta water users solely by virtue of such substitution. (Italics added.) Read in its entirety, providing salinity control and an adequate water supply are among the functions of the SWP under section 12202. There is nothing in the language of the DPA to require the SWP to serve all the functions in any given situation. We recognized in the SWRCB Cases that the DPA serves dual goals and must, in the first instance, . . . balance in-Delta needs and export needs. (136 Cal.App.4th at pp. 768, 770.)
In the SWRCB Cases, we also affirmed in the SWRCBs legal conclusion that the DPA creates no new and separate water right to users of water in the Delta by stating that, nothing in the Delta Protection Act purports to grant any kind of water right to any particular party. (136 Cal.App.4th at pp. 771-772.) Thus, the SWRCB properly concluded in Order WRO 2004-0004 that plaintiffs must have adequate existing water rights, acquired under the laws that govern acquisition of water rights, before they can divert and use water from the channels of the Delta. If existing water rights are not adequate to supply the needs of in-Delta water users, the Delta Protection Act does not ensure the Delta water users an adequate supply. (Order WRO 2004-0004 at p. 20, italics added.)
4. First in Time Rights of Seniority:
Citing El Dorado, plaintiffs argue implementation of Term 91 deprived them of their first in time, first in right appropriative rights against water rights held by the Projects. They note that the USBR holds a permit issued on application 27319 which is junior to all four of plaintiffs permits and authorizes direct diversion of 4,000 cfs from the Stanislaus River for hydropower generation any day of the year. (In re Petition for Assignment of Application . . . 27319 (Jan. 21, 1988) State Water Resources Control Bd. Dec. No. 1616 at pp. 4, 36 & 37.) In addition, plaintiffs state that the USBR holds water rights permit Nos. 16211, 16212 and 15735 which are junior to licenses held by the Phelpses and authorize diversion for hydropower as well as other uses. (Decision 1485, supra, Table I, at p. 36.) Without citing evidence in the record, plaintiffs maintain that the USBRs use of these junior permits could result in or creates the potential for taking water away from the river systems to which the Phelpses and other plaintiffs have a prior right. There is no merit in this argument.
In El Dorado, we held that the SWRCB abused its discretion and violated the rule of priority by imposing Term 91 on the irrigation districts water right permit and failing to impose it on other, more junior appropriators in the watershed. (142 Cal.App.4th at p. 943.) In other words, should the SWRCB have applied Term 91 to all the permittees and licensees entitled to appropriate the water available for appropriation? We described how the rule of priority functions under a dual system of water rights that recognizes the doctrine of riparian rights and appropriative rights. (Id. at p. 961.) With respect to appropriative rights, as between appropriators, the rule of priority is first in time, first in right. [Citation.] The senior appropriator is entitled to fulfill his needs before a junior appropriator is entitled to use any water. (Ibid., citing United States v. State Water Resources Control Bd., supra, 182 Cal.App.3d at pp. 101-102.) Based on the rule of priority, we concluded the SWRCB abused its discretion by imposing Term 91 on the irrigation district and not the more junior appropriators. Plaintiffs do not contend in this case that there are other, non-Project appropriators in the watershed that are capable of diverting water during the Term 91 curtailment period.
We also made clear in El Dorado that the rule of priority applies only to the use of natural or abandoned flows in a watercourse. No riparian or appropriator has a right to use water that was previously stored or imported by another upstream and then released into the watercourse for use . . . . (142 Cal.App.4th at p. 962, italics added.) Under its express language, Term 91 applies to curtail diversion of permittees and licensees only when the natural flow is insufficient to meet Delta water quality standards and the Projects are required to release stored or imported water to meet those objectives. None of the plaintiffs permits entitled them to divert stored water or imported water.
5. Water Quality Standards:
Finally, plaintiffs contend that the SWRCB abused its discretion in basing implementation of Term 91 on water quality objectives set forth in In re Implementation of Water Quality Objectives for the San Francisco Bay/Sacramento-San Joaquin Delta Estuary (Dec. 29, 1999) State Water Resources Control Bd. Dec. No. 1641 (Decision 1641) rather than those required under Decision 1485, adopted in 1978. The newer standards increased the amount of water required. Plaintiffs concede that the SWRCB has discretion to modify all aspects of Term 91, but argue that the issue is whether it can do so in a manner that deprives [Plaintiffs] (and other water right holders subjected to Term 91) [of] the right to use water pursuant to their licenses without affording them some form of notice and a hearing before issuing the curtailment notices.
Although we disagree with plaintiffs that the director has broad discretion in the implementation of Term 91,[15]we conclude there is nothing in the Term 91 narrative formula that prevents the SWRCB from using the only valid, up-to-date measure of water quality available in order to protect the beneficial use of the Delta. The courts 1986 decision in United States v. State Water Resources Control Bd., supra, 182 Cal.App.3d 82, invalidated the water quality standards set forth in Decision 1485. Rather than remand the case, the court allowed the SWRCB to continue proceedings already under way to establish new water quality objectives that were implemented under Decision 1641 in 1999. (Id. at pp. 97-98, 120-121; Decision 1641 at p. 180.) Plaintiffs had ample notice that the water quality standards set forth in Decision 1485 were inapplicable.
III.
The Remainder of the Courts Findings Are Supported
By Substantial Evidence
Plaintiffs state in the introduction to their opening brief: Although [plaintiffs] and their predecessors have been diverting water onto these same lands for irrigation since the 1850s and 1870s pursuant to what was thought and recognized to be pre-1914, riparian and overlying water rights, in an effort to further protect the rights to divert they filed applications for post-1914 appropriative water rights from the SWRCB in the 1960s. This statement is misleading in light of the evidence. Plaintiffs cite no evidence to support the claim they filed permit applications to further protect recognized pre-1914, riparian and overlying water rights. More importantly, the record does not support plaintiffs claim to water rights in addition to those granted by the SWRCB in their permits and licenses.
A. The Courts Factual Findings:
The trial court made the following factual findings in support of its denial of plaintiffs petition/complaint:
1. Plaintiffs claim that the SWRCB was estopped from enforcing Term 91 against them is undermined by the admonitions of [the Boards] staff during the 2000 Term 91 curtailment period that [plaintiffs] would have to prove the existence of their previously assumed riparian rights or potentially face civil penalties for diversions during the curtailment period.
2. At best, the evidence is speculative and inconclusive as to whether [plaintiffs] parcels retained riparian rights after their conveyance and whether any such retained rights were preserved by continuous use thereafter.
3. Plaintiffs do not overcome the lack of solid, credible evidence to establish retained and preserved riparian rights by their assertion of a riparian rights theory based on the connection between groundwater and surface water.
4. The evidence . . . does not establish an essential element of a pre-1914 right to appropriate water: the actual appropriation of water from the San Joaquin or Middle Rivers before 1914 for the irrigation of [plaintiffs] parcels on Upper Roberts Island.
In light of the principles governing appellate review, we conclude the courts findings are supported by substantial evidence. (Bancroft-Whitney Co. v. McHugh (1913) 166 Cal. 140, 142 (Bancroft-Whitney); Hall, supra, 98 Cal.App.4th at p. 637.)
B. Estoppel:
Plaintiffs argue that the SWRCB was estopped from enforcing Term 91 against them given the specific and repeated written assertions . . . previously made by the [Boards] staff that [plaintiffs] indeed had riparian rights which would supply their needs during times when Term 91 might be in effect. Plaintiffs cite in support of their argument the following statements mostly handwritten notes contained in various inspection reports and license checks prepared by SWRCB staff between 1984 and 1997.
Relating to Plaintiff Ratto:
When term 91 is implemented, applicant may use riparian right since project is in Delta lowlands. (Check for Permit dated Dec. 4, 1984.)
Applicant has provided assurance of supplemental water supply during summer. Riparian right. (Check for Permit dated Dec. 4, 1984.)
Other Rights, Riparian Delta Lowlands. (Report of Inspection dated Sept. 13, 1994.)
Therefore we are apparently accepting the claims of riparian rights pending any adjudication in the area. . . . [] . . . [] I left a message on the Rattos answering machine concerning the alternate water supply by use of claim of riparian right during the Term 91 curtailment period. (Contact Report dated July 9, 1997.)
Relating to Plaintiff Phelps:
They have no alternate source of water, however, because of their location in the Delta Lowlands their claim of riparian rights appears to be valid. Thus, they can divert under riparian right as long as natural runoff is flowing in the Middle River. (Report of Inspection dated May 19, 1988.)
The place of use can be said to be riparian to the source since it is located on Roberts Island in the Delta. (Report of Inspection dated June 2, 1988.)
Believe inspection report should better explain A) Located on Roberts Island in Delta, can claim riparian. Why no alternate supply is necessary for periods when Term 91 cuts off diversions under this permit. (Check for License dated May 15, 1996.)
Relating to Plaintiff Conn:
Other Rights Riparian Within Delta Lowlands. (Report of Inspection dated Apr. 26, 1996.)
The long-established doctrine of equitable estoppel is based on foundation of conscience and fair dealing. (City of Long Beach v. Mansell (1970) 3 Cal.3d 462, 488 (Mansell).) The Supreme Court expressed the doctrine in its classic form: ‛The vital principle is that he who by his language or conduct leads another to do what he would not otherwise have done shall not subject such person to loss or injury by disappointing the expectations upon which he acted. Such a change of position is sternly forbidden. It involves fraud and falsehood, and the law abhors both. (Seymore v. Oelrichs (1909) 156 Cal. 782, 795 (disapproved on another ground in Sterling v. Taylor (2007) 40 Cal.4th 757, 769.)
Estoppel may be applied against the government where justice and right require it. (Mansell, supra, 3 Cal.3d at p. 493.) However, courts will not apply estoppel to a public agency if the result will be the frustration of a strong public policy. (Bible v. Committee of Bar Examiners (1980) 26 Cal.3d 548, 553.) Public policy must be considered where a party raises estoppel to prevent enforcement of environmental statutes. (See People ex rel. State Air Resources Bd. v. Wilmshurst (1999) 68 Cal.App.4th 1332, 1347 [air quality]; and Raley v. California Tahoe Regional Planning Agency (1977) 68 Cal.App.3d 965, 975-976 [land use].)
Based on these principles, Mansell and its progeny describe the two-part inquiry involved in determining whether estoppel is proved: First, a court must determine whether the traditional elements necessary for assertion of an estoppel against a private party are present. These elements include the following: (1) The party to be estopped must be apprised of the facts; (2) he must intend that his conduct shall be acted upon, or must so act that the party asserting the estoppel had a right to believe it was so intended; (3) the other party must be ignorant of the true state of facts; and (4) he must rely upon the conduct to his injury. [Citation.] Second, the court must weigh the equities and consider the impact on public policy of permitting an estoppel in a given case. The existence of an estoppel is a factual question. [Citation.] (J.H. McKnight Ranch, Inc. v. Franchise Tax Bd. (2003) 110 Cal.App.4th 978, 991 (McKnight Ranch); see Mansell, supra, 3 Cal.3d at p. 489.) We conclude there is substantial evidence to support the trial courts finding that plaintiffs failed to establish the element of reliance.
First, the cited comments reflect staff assumptions based on the fact plaintiffs land is located in the Delta Lowlands on Roberts Island.[16] One comment refers to the claims of riparian rights. There is no indication of the various contact reports and inspect reports that the plaintiffs claimed riparian rights had ever been adjudicated.
Second, case law is clear that unauthorized legal representations by agency staff cannot provide the basis for estoppel against the agency. (Illinois Commercial Mens Assn. v. State Bd. of Equalization (1983) 34 Cal.3d 839, 855-856; Pipe Trades Dist. Council No. 51 v. Aubry (1996) 41 Cal.App.4th 1457, 1474; California Horse Racing Bd. v. Los Angeles Turf Club <


