Filed 11/19/26
CERTIFIED FOR PARTIAL PUBLICATION*
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
FIRST APPELLATE DISTRICT
DIVISION ONE
TRUCONNECT
COMMUNICATIONS, INC.,
Plaintiff and Appellant, A172474
v. (City and County of San
MAXIMUS INC. et al., Francisco Super. Ct.
No.CGC-21-589607)
Defendants and
Respondents.
The California Public Utilities Commission (CPUC) hired respondents
Maximus Inc. and Solix Inc. to design and implement a new software
platform for a program to provide telephone service to lower-income
Californians. Appellant TruConnect, Inc. sued Maximus and Solix for
damages it allegedly suffered because the new platform was defective. The
trial court sustained a demurrer to TruConnect’s claims after it concluded
that defendants did not owe TruConnect a duty of care and were not unjustly
enriched. We conclude that the trial court was correct, and we therefore
affirm.
* Pursuant to California Rules of Court, rules 8.1105(b) and 8.1110, this
opinion is certified for publication with the exception of parts IIB and IIC.
1
I.
FACTUAL AND PROCEDURAL
BACKGROUND1
TruConnect provides free wireless telephone service to eligible low-
income Californians under a government-subsidized program called
“LifeLine.” The Federal Communications Commission established LifeLine
in 1985, and the CPUC oversees the program in California. TruConnect’s
only business is purchasing wireless services from carriers that have their
own transmission facilities, then reselling those services to TruConnect’s own
subscribers through LifeLine. The company earns more than 90 percent of
its revenue through services provided to California LifeLine enrollees.
The CPUC is authorized to administer LifeLine under the Moore
Universal Telephone Service Act (Pub. Util. Code, § 871 et seq.).2 The
commission in 1983 adopted General Order 153 to implement the program in
California. The CPUC reimburses LifeLine providers for providing service.
TruConnect is the second largest provider of LifeLine services in California.
Because of the logistical complexities of enrolling subscribers and
providing reimbursement, the CPUC contracts with a third-party
administrator to process enrollments and track reimbursements. TruConnect
was pleased with the company that served as the administrator from
December 2011 through March 2019. In summer 2018, the CPUC hired
Maximus as a new third-party contractor to administer the LifeLine
program. TruConnect offered to help Maximus develop its LifeLine
1 The following facts are taken from the allegations of TruConnect’s
second amended complaint, which we accept as true on appeal from the
sustaining of a demurrer. (Doe v. City of Los Angeles (2007) 42 Cal.4th 531,
543.)
2 All unspecified statutory references are to the Public Utilities Code.
2
administration platform to ensure a smooth transition. Maximus declined
TruConnect’s offer and instead hired Solix as a subcontractor. According to
TruConnect’s operative complaint, Maximus and Solix “negligently designed
and implemented a software platform for administering the LifeLine program
that proved grossly inadequate when the platform was launched on April 2,
2019. Hundreds of thousands of TruConnect’s LifeLine applicants and
renewing subscribers who met the program’s objective eligibility
requirements were denied approval due to the platform’s failure. As a result,
TruConnect suffered tens of millions of dollars in lost revenues and incurred
millions of dollars in personnel time necessary to fix Maximus’ defective
platform.”
It took “months” to solve several problems with the new platform. The
operative complaint alleges that both the CPUC’s deputy executive director
and Maximus “asked TruConnect to commit its team of software engineers
and operational and technical staff to the task of salvaging the platform.”
TruConnect personnel “spent hundreds of thousands of hours working to
resolve the platform’s countless programming defects,” which cost
TruConnect “well in excess of $3 million dollars in time and resources.” Both
the CPUC and Maximus expressed gratitude for TruConnect’s assistance.
TruConnect first sought reimbursement from the CPUC. The
commission approved some initial claims for lost revenues and costs, but in
September 2020 it adopted Resolution T-17707, which rejected
reimbursement for lost-opportunity costs (i.e., revenue TruConnect claimed it
lost because otherwise eligible customers were rejected by the defective
platform).
TruConnect in September 2020 sued the CPUC, Maximus, and Solix.
The company soon recognized that the trial court lacked jurisdiction over the
3
CPUC, and it requested dismissal of the case less than two months after it
was filed. TruConnect initiated this lawsuit in February 2021 against
Maximus and Solix only, and it later filed a first amended complaint.
Maximus and Solix demurred to the complaint, and the trial court sustained
the demurrers without leave to amend based on the conclusion that
section 1759 barred the complaint. This court reversed the ruling and
remanded to the trial court to consider whether the lawsuit failed for any
other reason. (TruConnect Communications, Inc. v. Maximus Inc. (2023)
91 Cal.App.5th 497 (TruConnect I).)
TruConnect then filed a second amended complaint, which is the
operative complaint. It alleges causes of action for negligence, negligent
interference with prospective economic relations, quantum meruit, unjust
enrichment, and unlawful business practices in violation of Business and
Professions Code section 17200 et sequitur.
Maximus and Solix demurred to the second amended complaint on the
ground that it failed to state a valid cause of action. Solix demurred to the
complaint on the ground that the CPUC was a necessary and indispensable
party that could not be joined because the court lacked jurisdiction over it
(§ 1759). Maximus and Solix each joined in the other’s demurrer.
The trial court sustained Maximus’s demurrer without leave to amend.
It concluded that TruConnect failed to allege that defendants owed the
company a duty sufficient to state a claim for negligence. And the court also
concluded that the second amended complaint failed to state a cause of action
under any other theory TruConnect advanced.3
3 The court overruled Solix’s demurrer because it concluded that the
CPUC is not a necessary and indispensable party to the action. But because
the court also concluded that the complaint did not state a cause of action, it
dismissed the complaint in its entirety as to both defendants.
4
TruConnect appealed from the subsequent judgment. Maximus and
Solix have filed a joint respondents’ brief. Because they do not distinguish
between the companies when responding to TruConnect’s arguments, we will
apply the same analysis to both of them. The CPUC has filed an amicus
curiae brief in support of defendants.
II.
DISCUSSION
A. TruConnect’s Negligence Cause of Action and Derivative Claims Fail
Since Defendants Did Not Owe the Company a Duty of Care.
As we have said, the trial court concluded that TruConnect failed to
allege that defendants owed the company a duty of care sufficient to state a
claim for negligence. Although we recognize that some relevant factors weigh
in favor of finding a duty, the greater weight of them compels us to agree
with the trial court.
Negligence is conduct that “ ‘falls below the standard established by
law for the protection of others.’ ” (Bily v. Arthur Young & Co. (1992)
3 Cal.4th 370, 396 (Bily), quoting Rest.2d Torts, § 282.) “Recovery in a
negligence action depends as a threshold matter on whether the defendant
had ‘ “a duty to use due care toward an interest of [the plaintiff’s] that enjoys
legal protection against unintentional invasion.” ’ [Citations.] We review de
novo whether this ‘ “essential prerequisite” ’ to recovery is satisfied.”
(Southern California Gas Leak Cases (2019) 7 Cal.5th 391, 397–398 (Gas
Leak Cases).)
“In California, the ‘general rule’ is that people owe a duty of care to
avoid causing harm to others and that they are thus usually liable for
injuries their negligence inflicts.” (Gas Leak Cases, supra, 7 Cal.5th at
p. 398.) This rule is statutorily based: “Everyone is responsible, not only for
the result of his or her willful acts, but also for an injury occasioned to
5
another by his or her want of ordinary care or skill in the management of his
or her property or person, except so far as the latter has, willfully or by want
of ordinary care, brought the injury upon himself or herself.” (Civ. Code,
§ 1714, subd. (a).) But while courts “frequently beg[in their] analysis by
presuming a duty of care[, they] have not universally done so.” (Gas Leak
Cases, at p. 400.)
One area where courts do not begin by presuming a duty of care is with
claims of “liability in negligence for purely economic losses,” for which there
is instead a contrasting “general rule of no recovery.” (Gas Leak Cases,
supra, 7 Cal.5th at p. 400.) Recognizing “a duty to manage business affairs so
as to prevent purely economic loss to third parties in their financial
transactions is the exception, not the rule, in negligence law.”
(Quelimane Co. v. Stewart Title Guaranty Co. (1998) 19 Cal.4th 26, 58.)
The justifications advanced for not presuming a duty of care in these cases
“include foreseeability and the prevention of limitless liability.” (Sharkey,
The Irresistible Simplicity of Preventing Harm (2023) 16 J. Tort L. 143, 154.)
Still, the presumption of no duty of care when only economic losses are
sustained has been criticized, especially when the rule is applied in situations
where the plaintiff victim was known by the defendant tortfeasor and the
parties were connected, as “when they have a contractual or quasi-
contractual relationship.” (Id. at p. 155)
The Legislature has created statutory exceptions to the rule. In
response to a Supreme Court decision that disallowed homeowners from
suing developers and contractors in negligence for construction defects that
had not caused property damages (Aas v. Superior Court (2000) 24 Cal.4th
627, 632), the Legislature created a “statutory mechanism specifically
designed for homeowners seeking redress against negligent builders” for
6
economic loss without accompanying property damage. (Gas Leak Cases,
supra, 7 Cal.5th at p. 412, citing Civ. Code, § 895 et seq.)
The common law has also created exceptions, with the primary one
being “where the plaintiff and the defendant have a ‘special relationship.’ ”
(Gas Leak Cases, supra, 7 Cal.5th at p. 400.) What is meant by a special
relationship “is that the plaintiff was an intended beneficiary of a particular
transaction but was harmed by the defendant’s negligence in carrying it out.”
(Ibid.) Here, TruConnect maintains it had such a relationship with
Maximus, while defendants deny it.
Whether the parties have a special relationship is a critical, but not the
exclusive, factor bearing on whether there is a duty of care, as the analysis
“turns on a careful consideration of ‘ “ ‘ “the sum total” ’ ” ’ of the policy
considerations at play, not a mere tallying of some finite, one-size-fits-all set
of factors.” (Gas Leak Cases, supra, 7 Cal.5th at p. 401.) California courts
“have employed a checklist of factors to consider in assessing legal duty in the
absence of privity of contract between a plaintiff and a defendant.” (Bily,
supra, 3 Cal.4th at p. 397.) These factors include “the extent to which the
transaction was intended to affect the plaintiff, the foreseeability of harm to
him [or her], the degree of certainty that the plaintiff suffered injury, the
closeness of the connection between the defendant’s conduct and the injury
suffered, the moral blame attached to the defendant’s conduct, and the policy
of preventing future harm.” (Biakanja v. Irving (1958) 49 Cal.2d 647, 650.)
After applying these factors, Biakanja permitted a sole beneficiary of a will to
bring a negligence claim against a notary public—a person with whom she
had no contractual relationship—for negligently failing to have the will
properly attested, resulting in the beneficiary suffering economic injury by
recovering only one eighth of the estate. (Id. at pp. 650–651.) We therefore
7
proceed to discuss each of the relevant Biakanja factors as applied to the
circumstances of this case, and we ultimately conclude that this is not one of
those rare situations in which a duty can be found to have been owed to
protect against the purely economic interests of a non-contracting plaintiff.
Extent to which transaction was meant to benefit TruConnect: As we
have said, a “special relationship” exists between parties when “the plaintiff
was an intended beneficiary of a particular transaction but was harmed by
the defendant’s negligence in carrying it out.” (Gas Leak Cases, supra,
7 Cal.5th at p. 400.) The parties have sharply different views on whether
such a relationship existed here, but we think defendants have the better
argument. TruConnect and defendants were essentially separate
subcontractors of the PUC in the effort to provide telephone service to lower-
income Californians. While it is no doubt true that Maximus’s agreement
with the CPUC necessarily affected TruConnect’s economic interests, there is
no indication that the parties entered into the agreement for the purpose of
benefitting those interests. And even though the agreement affected
TruConnect, it could be effected without necessarily doing so. This contrasts
with the facts in Biakanja, where the will was intended to benefit a specific
person, i.e., the beneficiary plaintiff.
Although we are not persuaded by TruConnect’s argument that the
first Biakanja factor was met here, we accept that it is a close question.
Maximus and the CPUC insist their contract was meant to further the
LifeLine program’s goal of providing universal telephone service, and not to
benefit TruConnect. As the CPUC puts it in its amicus brief, “[T]he primary
purpose of the Commission’s contract with Maximus is to benefit low-income
customers; a secondary purpose is to benefit the Commission in carrying out
its statutory obligation to verify LifeLine applicants’ eligibility under State
8
law to receive subsidized basic communication service.” Although the CPUC
characterizes customer eligibility as a “secondary” purpose, it appears that
this was Maximus’s only specific role in the LifeLine program―a role that is
necessarily connected to TruConnect’s interest in obtaining such customers.
TruConnect and Maximus were linked in the effort to expand universal
phone service.
But TruConnect goes too far in arguing that parties to a contract need
only to have known that the contract “would directly and necessarily affect
the economic interests of a third-party plaintiff” in order to show that the
contract was meant to benefit that third party (or class of which the plaintiff
is a member). If that were the case, an intent to benefit would be established
whenever harm to a third party was foreseeable, which is not the law. (E.g.,
Bily, supra, 3 Cal.4th at p. 398 [declining to allow recovery for “merely
foreseeable” users of audit reports].)
At the same time, defendants go too far in arguing that a plaintiff
asserting a claim for negligence for only economic losses must make an
identical intent-to-benefit showing that is necessary when alleging a cause of
action for breach of contract. They rely on Goonewardene v. ADP, LLC (2019)
6 Cal.5th 817 (Goonewardene), where an employer outsourced its payroll
functions by hiring an independent payroll service provider. (Id. at p. 820.)
An employee sued both the employer and the payroll company alleging that
the employer failed to pay her money owed under the Labor Code and then
fired her when she raised the wage-and-hour claims. (Goonewardene at
pp. 820, 822.) Our Supreme Court first analyzed whether the employee could
maintain a cause of action for breach of contract against the payroll company
under the state’s third party beneficiary doctrine. (Id. at pp. 826–827, citing
Civ. Code, § 1559 [“A contract, made expressly for the benefit of a third
9
person, may be enforced by him [or her] at any time before the parties thereto
rescind it.”].) Under state common law, courts “carefully examine[] the
express provisions of the contract at issue, as well as all of the relevant
circumstances under which the contract was agreed to, in order to determine
not only (1) whether the third party would in fact benefit from the contract,
but also (2) whether a motivating purpose of the contracting parties was to
provide a benefit to the third party, and (3) whether permitting a third party
to bring its own breach of contract action against a contracting party is
consistent with the objectives of the contract and the reasonable expectations
of the contracting parties.” (Goonewardene at pp. 839–830.) Goonewardene
held that the employee could not maintain a cause of action for breach of
contract since the motivating purpose of a contract with a payroll company is
to benefit the employer with the employer’s interests in mind, “not to provide
a benefit to its employees with regard to the amount of wages they receive.”
(Id. at p. 835.) We agree with defendants to the extent they argue that
TruConnect could not maintain a cause of action for breach of contract
against it under third party beneficiary principles (something TruConnect
does not claim). (E.g., Martinez v. Socoma Companies, Inc. (1974) 11 Cal.3d
394, 397, 401 [even though government program was meant to benefit
disadvantaged residents, those residents could not maintain breach of
contract claim because there was no intent to confer a direct right to them].)
Goonewardene went on to hold, based on a variety of policy
considerations, that the plaintiff likewise could not maintain a negligence
cause of action against the payroll company because the company had no
special relationship with the employee that would give rise to a duty of care.
(Goonewardene, supra, 6 Cal.5th at pp. 837, 839–841.) The court observed
that since California’s third party beneficiary law did not apply to the
10
employee, “it would clearly be anomalous to impose tort liability.” (Id. at
p. 840.) Defendants here apparently interpret this statement to mean that
whenever a plaintiff is not a third party beneficiary of a contract, the first
Biakanja factor cannot be met, and a negligence action must necessarily fail.
This is an overstatement.4 (See Beacon Residential Community Assn. v.
Skidmore, Owings & Merrill LLP (2014) 59 Cal.4th 568, 584 (Beacon) [“[W]e
have never held that third party beneficiary status is a prerequisite to
alleging negligence.”], italics added; Heyer v. Flaig (1969) 70 Cal.2d 223, 227
[contractual theory of recovery “conceptually superfluous” where “the crux of
the action must lie in tort . . . ; there can be no recovery without negligence”],
disapproved on another ground in Laird v. Blacker (1992) 2 Cal.4th 606, 617;
Levy v. Only Cremations for Pets, Inc. (2020) 57 Cal.App.5th 203, 213–214,
217–218 [although complaint against pet-cremation service did not state
valid contract cause of action, it did state a valid cause for negligence since
4 Defendants repeatedly cite Lichtman v. Siemens Industry Inc. (2017)
16 Cal.App.5th 914 for this proposition. Lichtman reversed a grant of
summary judgment in favor of a company that maintained a battery backup
system for traffic lights and was sued by passengers injured in a car accident
when the lights were out. (Id. at p. 918.) The court held that the company
had not shown as a matter of law that it owed no duty of care to the
passengers for allegedly negligently maintaining the system. (Ibid.) In a
section titled “Duty―Overview” (id. at p. 920), the court discussed the overlap
between duties arising from contract and common law and noted that “in the
Biakanja context, the consideration concerning ‘the extent to which the
transaction was intended to affect the plaintiff’ serves as a bridge between
the absence of privity and liability, particularly in situations where the only
claimed losses are economic.” (Id. at pp. 921–922.) The court ultimately
concluded that the contract between the battery-system company and a city
was “clearly intended to, and [did], affect plaintiffs.” (Id. at p. 924.) While
this is no doubt correct, defendants overstate this holding insofar as they
claim that the intent-to-benefit element is identical in contract and
negligence actions.
11
defendant company owed the plaintiffs a duty arising out of a special
relationship]; Ratcliff Architects v. Vanir Construction Management, Inc.
(2001) 88 Cal.App.4th 595, 605 [although declining to find duty,
acknowledging that public policy may support a duty to third parties even
where contract specifically excluded third party beneficiaries from having any
rights under a contract].)
Defendants also place excessive reliance on Gas Leak Cases, supra,
7 Cal.5th 391. In Gas Leak Cases, “a massive, months-long leak from a
natural gas storage facility” (id. at p. 394) caused around 15,000 residents of
a Los Angeles suburb to evacuate. (Id. at p. 396.) Businesses seeking to
represent a class of all people and entities conducting business within five
miles of the defendant’s natural gas storage facility sued for the economic loss
caused by the leak. (Ibid.) Gas Leak Cases held that there was no tort duty
to compensate for “purely economic losses suffered from mere proximity to an
industrial accident” since such a duty would “create intractable line-drawing
problems for courts.” (Id. at pp. 394–395.) Policy considerations no doubt
support limiting the “potentially overwhelming liability . . . stemming from
man-made calamity” where it would be challenging to limit the class of
plaintiffs either geographically or temporally. (Id. at pp. 403, 408, 411.) But
this case is vastly different, as there is only one plaintiff, whose claims are
limited in time and scope.
Defendants and the CPUC also overstate the holding of Giacometti v.
Aulla, LLC (2010) 187 Cal.App.4th 1133, 1139 when they claim that a
contract is meant to benefit a third party only if that is the “ ‘prime’ ” or “sole”
purpose of the agreement. The plaintiff waiters in Giacometti alleged that
their restaurant managers improperly allocated a percentage of the waiters’
tips to themselves. (Id. at p. 1135.) The waiters sued the accountants hired
12
by the restaurant to prepare yearend W-2 documents for negligence since the
forms allegedly overreported the employees’ income based on the
misallocated tips. (Id. at pp. 1135–1136.) The court held that the
accountants did not owe a duty of care to the waiters based in part on the fact
that “the restaurant’s intention in hiring the accountants was not to benefit
the employees but to fulfill a legal obligation to furnish pay information to
the IRS.” (Id. at p. 1139.) The facts here are unlike those in Giacometti. The
defendant accountants in Giacometti were not alleged to have been hired to
compile or verify payroll numbers, to have failed to properly analyze payroll
records, or to have known or to have had reason to believe that the
documents they were provided contained incorrect information. (Ibid.) Here,
by contrast, defendants are alleged to be the source of incorrect (or missing)
information, contrary to the very reason they were hired.
We disagree with TruConnect that J’Aire Corp. v. Gregory (1979)
24 Cal.3d 799 (J’Aire) compels reversal. There, a company that ran a
restaurant at a county airport sued a general contractor for allegedly taking
too long to complete work on the premises that the restaurant leased from
the county. (Id. at p. 802.) The court concluded that the contractor owed a
duty to the lessee since the contract between the county and the contractor
was for the renovation of a space where the appellant did business, so “[t]he
contract could not have been performed without impinging on that business.
Thus respondent’s performance was intended to, and did, directly affect [the
restaurant].” (Id. at p. 804.) TruConnect contends that under J’Aire, the
intent-to-benefit factor is met “where the contracting parties knew at the
time of contracting that the defendant’s performance would directly and
necessarily affect the third-party plaintiff’s economic interests.” But again, in
J’Aire, the relevant contract could not be performed without benefitting the
13
plaintiff. Here, while it is true that some telecommunications company (or
companies) will benefit when a program administrator correctly identifies
eligible customers, that company will not necessarily be TruConnect.
J’Aire stressed that “[l]iability for negligent conduct may only be
imposed where there is a duty of care owed by the defendant to the plaintiff
or to a class of which the plaintiff is a member.” (J’Aire, supra, 24 Cal.3d at
p. 803.) TruConnect apparently contends that because it was in a class
affected by Maximus’s agreement with the CPUC, the agreement was
intended to benefit the company. We are not persuaded. Again, the question
turns on whether the agreement would necessarily benefit the identified
plaintiff. For example, in Centinela Freeman Emergency Medical
Associates v. Health Net of California, Inc. (2016) 1 Cal.5th 994, 1001, 1014,
the court held that the defendant health plans owed a duty of care to plaintiff
emergency-service providers where the plans delegated their financial
responsibility for emergency services to practice associations that became
insolvent. The court noted that the emergency-service providers were “a
specific and well-defined class, which was reasonably identifiable by their
practice specialization, hospital affiliation, and geographic location” when the
defendant health plans delegated its financial responsibility to a practice
association. (Id. at p. 1014.) Although the contracts between the health plan
and the practice association “may have broadly covered all health care
services rendered for the Health Plans’ enrollees, the specific contractual
delegation of the Health Plans’ statutory obligation to reimburse [plaintiff]
emergency service providers for their emergency services and care [citation]
was necessarily intended to have an effect on plaintiffs.” (Ibid.) In other
words, this delegation involved specific, identifiable service providers. Here,
by contrast, the agreement between the CPUC and Maximus was intended to
14
help the CPUC identify people who qualified for LifeLine―but not to assign
them to any particular carrier.
TruConnect also relies on Beacon, supra, 59 Cal.4th 568, which held
that a project’s principal architect who was alleged to have negligently
designed a residential building owed a duty of care to future homeowners
since the architect’s work was intended to benefit the homeowners who would
live in the units. (Id. at pp. 571, 586.) The court concluded that the
defendant architects “ ‘were more than well aware that future homeowners
would necessarily be affected by the work that they performed.’ ” (Id. at
p. 584.) TruConnect would have us interpret this holding to mean that, as a
party that necessarily is affected by accurate information from the LifeLine
program administrator, it was an intended beneficiary of the CPUC’s
agreement with Maximus. Again, though, even though the affected
homeowners could not be identified when the architects were hired to design
the building in Beacon, any work by an architect necessarily affects the
people who will live in the specific dwellings that an architect designs. Here,
by contrast, the only party that would necessarily be affected by Maximus’s
performance was the CPUC, which contracted for administration of LifeLine.
The decision whether to impose a duty is ultimately a policy question,
and the policy considerations present in Beacon are absent here. Beacon’s
“average home buyer” plaintiffs were “akin to ‘the “presumptively powerless
consumer” in product liability cases,’ ” who “ ‘ “clearly relies on the skill of the
developer and on its implied representation that the house will be erected in
reasonably workmanlike manner and will be reasonably fit for habitation.
[The homeowner] has no architect or other professional advisor of his own, he
has no real competency to inspect on his own, his actual examination is, in
the nature of things, largely superficial, and his opportunity for obtaining
15
meaningful protective changes in the conveyancing documents prepared by
the builder vendor is negligible.” ’ ” (Beacon, supra, 59 Cal.4th at pp. 584–
585.)
TruConnect, by contrast, is a business that is more akin to the
sophisticated plaintiffs in Bily, supra, 3 Cal.4th 370, where our Supreme
Court concluded that an accountant auditor does not owe a general duty of
care to people other than the auditor’s client. (Id. at pp. 375–376.) Plaintiffs
were people who relied on an audit opinion before investing in a company,
and who ultimately lost their investments after the company filed for
bankruptcy. (Id. at pp. 377–378.) Among the factors weighing against
finding a duty was that “the generally more sophisticated class of plaintiffs in
auditor liability cases (e.g., business lenders and investors) permits the
effective use of contract rather than tort liability to control and adjust the
relevant risks through ‘private ordering.’ ” (Id. at p. 398.) The court was
further concerned that exposing an auditor to negligence claims from “all
foreseeable third parties” would result in “potential liability far out of
proportion to its fault.” (Ibid.)
In our view, the biggest policy consideration weighing in TruConnect’s
favor is that absent a finding of duty, the company lacks a remedy for what is
alleged to be a significant financial loss. This is different from the situation
in Goonewardene, where “perhaps” the “most significant[]” factor weighing
against a duty was that the plaintiff employee could sue her employer
directly. (Goonewardene, supra, 6 Cal.5th at p. 839.) “California law already
provides the employee with a full and complete remedy for any wage loss the
employee sustains as a result of the payroll company’s negligent conduct. An
employee’s interest in this regard is fully protected by the employee’s well-
established right[s] under the labor statutes to recover in a civil action
16
against the employer . . . . Given the employer’s clear and direct liability for
any wage loss caused by the payroll company’s negligence in calculating the
wages that are due, the imposition of a separate tort duty of care on a payroll
company is generally unnecessary to adequately protect the employee’s
interests.” (Ibid., italics added.) Here, by contrast, TruConnect has no right
to recover from the CPUC. But imposing liability in this situation still risks
the imposition of “liability out of proportion to fault or [the promotion of]
virtually unlimited responsibility for intangible injury” (Bily, supra, 3 Cal.4th
at p. 398) where a relatively sophisticated plaintiff could take steps to protect
itself in contract, either through its own agreement with the CPUC or
through insurance.5
According to defendants, the absence of this first Biakanja element is
dispositive. Our Supreme Court has stressed, though, that “[d]iscerning
whether there is a special relationship justifying liability [for purely economic
loss] can . . . be a subtle enterprise,” and the court has “emphasized that [its]
duty determination [has] rested not just on” the intent-to-benefit factor, but
5 TruConnect claims that it would be unjust to consider its ability to
insure against loss since defendants had equal access to insurance. The cases
upon which it relies are inapposite because, unlike here, the power
differential between the plaintiffs and the defendants was extreme. One
involved a situation where the defendants were far more sophisticated than
the plaintiffs who sued in tort. (Kesner v. Superior Court (2016) 1 Cal.5th
1132, 1153 [defendant companies that exposed plaintiff employees’ household
members to asbestos were in better position to prevent harm, and tort system
contemplates that cost will be insured by defendants].) The other did not
mention insurance but instead involved a defendant residential care facility
charged with a duty to prevent a sexual assault against a developmentally
disabled adult where “[t]he array of [the facility’s] possible safety precautions
all involved costs that pale in comparison” to the “the toll of [a] possible
attack on a disabled client.” (Jane IL Doe v. Brightstar Residential Inc.
(2022) 76 Cal.App.5th 171, 183.)
17
also on the remaining Biakanja factors. (Gas Leak Cases, supra, 7 Cal.5th at
p. 401, italics added.) On balance, though, the remaining factors do not
weigh in favor of finding a duty.
Foreseeability of harm: We agree with the trial court that it was
foreseeable that any error in defendants’ platform identifying eligible
customers would harm TruConnect. Regardless of whether the CPUC and
Maximus’s agreement was intended to benefit TruConnect, defendants
certainly had to have known that inaccurate information would harm
TruConnect’s business.
In arguing to the contrary, Maximus focuses on the CPUC’s alleged
unfulfilled promises to make TruConnect whole after the company suffered
financial loss. According to Maximus, it “had no reason to anticipate (1) that
the CPUC would promise to make TruConnect whole; (2) the CPUC would
later provisionally reimburse TruConnect; and (3) the CPUC would then
change position, demand claw-backs, and refuse any further payment.” But
the test is whether a defendant could have anticipated whether negligent
breach of an agreement would cause harm, not how the other party to the
agreement would respond to that harm. (E.g., National Union Fire Ins. Co. of
Pittsburgh, PA v. Cambridge Integrated Services Group, Inc. (2009)
171 Cal.App.4th 35, 46 (National Union) [“wholly foreseeable” that insurer’s
mishandling of workers’ compensation claims would affect excess insurer].)
Again, though, mere foreseeability of harm does not give rise to a duty in
negligence. (Bily, supra, 3 Cal.4th at p. 398.)
Degree of certainty that TruConnect suffered injury: According to the
operative complaint, “The profound problems afflicting Maximus’ platform
and TruConnect’s current lack of access to data within Maximus’ control
makes it impossible for TruConnect to conduct a customer-by-customer
18
accounting of its losses. But a comparison of TruConnect’s total subscriber
numbers before and after the Maximus launch reveal a loss of well over
200,000 new and renewing customers―costing the company more than
$20 million in lost revenues.” The complaint further alleges that TruConnect
employees spent “hundreds of thousands of hours” trying to fix problems with
defendants’ platform “at a cost well in excess of $3 million dollars in time and
resources” in order to mitigate damages caused by defendants’ alleged
negligence.
Defendants claim, and the trial court agreed, that the alleged damages
are uncertain. They point to the CPUC’s resolution that denied TruConnect’s
reimbursement request for lost-opportunity costs. Resolution T-17707
concluded that LifeLine program rules forbid recovery of “ ‘lost opportunities’
or ‘missed opportunities’ costs.” It further noted that the CPUC “must be
vigilant and protect the health of the fund” that supports LifeLine, and
allowing carriers to receive money for service they never provided “makes no
sense” and would encourage other carriers to submit similar claims. And it
also concluded that even if lost-opportunity costs were recoverable, “the
proposed recovery of those costs [was] too vague and uncertain to calculate
with any precision.” As we noted in TruConnect I, the comment about
vagueness and uncertainty “was made in the context of a company seeking
money through a routine reimbursement procedure, as opposed to seeking
damages through a court’s factfinding process.” (TruConnect I, supra,
91 Cal.App.5th at p. 509.) Although we made this observation in the context
of whether TruConnect’s lawsuit would conflict with a CPUC order or
interfere with the commission’s oversight of LifeLine in violation of
section 1759 (TrueConnect I at p. 506), it is also relevant here. Were the
complaint allowed to proceed, further discovery presumably would shed light
19
on possible limitations in determining alleged damages with certainty. We
are still concerned, though, that any potential damages would be
disproportionate to fault, especially where the CPUC’s agreement with
Maximus was not intended to benefit TruConnect.
Closeness of connection between defendants’ conduct and injury
suffered: The theory of TruConnect’s complaint is that absent bugs in
defendants’ software platform, the company would have enrolled many more
customers, and the company lost out on millions in revenue when the
platform erroneously determined those potential customers were in fact
ineligible for LifeLine. We agree with the trial court that if this theory were
proven, defendants’ conduct could be found to have injured TruConnect.
(National Union, supra, 171 Cal.App.4th at p. 47.)
Moral blame attached to defendants’ conduct: “Negligence in the
execution of contractual duties is generally held to be morally blameworthy
conduct.” (National Union, supra, 171 Cal.App.4th at p. 47, citing J’Aire,
supra, 24 Cal.3d at p. 805; see also Gilead Tenofovir Cases (2026) 20 Cal.5th
390, 422 [courts required “to evaluate moral blame categorically rather than
by reference to [defendant’s] precise circumstances and motivations”], italics
added; TruConnect I, supra, 91 Cal.App.5th at p. 513 [“While we accept that
Maximus was generally acting under its contractual relationship with the
CPUC, we do not agree that the CPUC, by virtue of that relationship,
authorized or directed Maximus to injure third parties with software
malfunctions and errors.”].)
Policy of preventing future harm: “The overall policy of preventing
future harm is ordinarily served, in tort law, by imposing the costs of
negligent conduct upon those responsible. The policy question is whether
that consideration is outweighed, for a category of negligent conduct, by laws
20
or mores indicating approval of the conduct or by the undesirable
consequences of allowing potential liability.” (Cabral v. Ralphs Grocery Co.
(2011) 51 Cal.4th 764, 781–782.) We agree with defendants that imposing
liability would expose them “to liability grossly disproportionate to their
fault.” Although we disagree that permitting recovery in negligence for
purely economic losses would lead to possible infinite liability (e.g., Gas Leak
Cases, supra, 7 Cal.5th at p. 414), as they claim, it would impose liability
where a sophisticated plaintiff could have taken steps to protect itself. We
likewise agree with defendants that “[e]xtending a duty here would expose
government contractors to claims for ‘lost’ opportunities from all manner of
participants in government programs, essentially making contractors like
Maximus a guarantor for their revenues.”6
Another policy consideration we must consider is the effect that
extending liability might have on the availability of government contractors,
as defendants and the CPUC assert. (E.g., Boyle v. United Techs. Corp.
(1988) 487 U.S. 500, 507 [“The imposition of liability on Government
contractors will directly affect the terms of Government contracts: either the
6 We part company with defendants and the CPUC when they claim
this is a situation where courts are reluctant to impose a duty where the
conduct at issue is governed both by contract and government regulations.
They rely on Long Beach Memorial Medical Center v. Kaiser Foundation
Health Plan, Inc. (2021) 71 Cal.App.5th 323, where the court declined to
recognize a legal duty in tort by health plans to reimburse hospitals for
emergency medical services no less than “the ‘reasonable and customary
value’ of those services.” (Id. at p. 337, quoting Cal. Code Regs.,
tit. 28, § 1300.71, subd. (a)(3)(B).) The court noted that the underlying duty
to repay already is governed by the Knox-Keene Health Care Service Plan
Act of 1975 (Health & Saf. Code, § 1340 et seq.). (Long Beach Memorial at
p. 338.) Here, while the LifeLine program may be governed by a regulatory
framework, there does not appear to be any complicated regulation of the
software platform at issue.
21
contractor will decline to manufacture the design specified by the
Government, or it will raise its price.”]; Balfour Beatty Infrastructure, Inc. v.
Rummel Klepper & Kahl, LLP (Md.Ct.App. 2017) 155 A.3d 445, 461
[“Imposing a tort duty on design professionals will likely correlate with an
increase in project costs and with a corresponding rise in price for
government entities.”].) We agree with the CPUC that imposing a duty on
defendants might “open the door to frequent litigation in excessive amounts,
likely resulting in fewer applicants for contracts, less-qualified contractors, or
higher fees.” If the Legislature wants to permit recovery against government
contractors who have suffered only economic loss due to the negligence of
another government contractor, it knows how. This was demonstrated when
the Legislature enacted, as we previously mentioned, Civil Code section 895
et sequitur, which provides a mechanism to allow homeowners to seek
redress against negligent developers and contractors for economic loss
without needing to prove accompanying property damage. (See Gas Leak
Cases, supra, 7 Cal.5th at p. 412, citing Civ. Code, §895 et seq.) And again,
we are sympathetic to defendants’ policy argument that “TruConnect is a
sophisticated commercial entity that chose to participate in the LifeLine
Program to advance its own business objectives” and that “[n]othing
prevented it from obtaining insurance to cover revenue interruptions, or from
negotiating with the CPUC for express contractual protections before
allegedly committing resources to the LifeLine platform.”
For all the foregoing reasons, we agree with the trial court that
TruConnect’s negligence cause of action fails as this is not one of the rare
instances where a duty exists to prevent a “purely economic loss to [a] third
part[y].” (Quelimane Co. v. Stewart Title Guaranty Co., supra, 19 Cal.4th at
p. 58.) The trial court further concluded that because defendants did not owe
22
TruConnect a duty, TruConnect’s cause of action for negligent interference
with prospective economic relations necessarily failed as well. (See Stolz v.
Wong Communications Limited Partnership (1994) 25 Cal.App.4th 1811,
1825 [“The tort of negligent interference with economic relationship arises
only when the defendant owes the plaintiff a duty of care.”], italics omitted.)
TruConnect does not argue otherwise on appeal. Finally, the trial court
concluded that TruConnect failed to state a cause of action for unfair
business practices since it was based on the company’s rejected negligence
claim. (AMN Healthcare, Inc. v. Aya Healthcare Services, Inc. (2018)
28 Cal.App.5th 923, 950 [when an underlying legal claim fails, so does a
derivative cause of action for unfair competition].) TruConnect’s only
appellate argument is that the unfair-competition law claim survives because
its negligence claim is valid, an argument we have rejected. We therefore
affirm on the causes of action for negligence, negligent interference with
prospective economic relations, and unfair competition.
B. TruConnect Has Not Alleged a Valid Restitution Cause of Action.
The trial court also concluded that TruConnect failed to state a cause of
action for quantum meruit and unjust enrichment. On appeal, TruConnect
argues that “[t]he allegations underlying these causes of action collectively
state a claim for ‘restitution’ based on unjust enrichment.” We are not
persuaded.
1. Additional Background.
TruConnect’s original complaint alleged that “the CPUC and Maximus
recruited TruConnect and its team of software engineers and operational and
technical staff to assist with the failed software launch.” The complaint
further alleged that “a top CPUC executive” promised TruConnect that the
company “would be made whole on all of its costs and losses that may result
23
from the Maximus platform implementation,” and “TruConnect accepted this
offer from the CPUC executive and quickly got to work trying to fix the
botched rollout.” The CPUC allegedly later “shifted course” and stated it
would not reimburse TruConnect for costs associated with fixing defendants’
new platform, and it would instead begin seeking the return of more than
“$9 [million] in previously reimbursed losses, payments that had been made
to induce TruConnect into fixing the Maximus and Solix roll-out.” Both the
causes of action for quantum meruit and unjust enrichment alleged generally
that “[d]efendants . . . asked TruConnect to help fix the Maximus/Solix
platform after its failed rollout in April 2019, and all Defendants relied on
TruConnect to save the LifeLine program.” TruConnect sought $14 million
for the benefit it allegedly conferred on defendants by helping to fix their
platform.
The operative complaint alleges that both a CPUC executive and
Maximus asked TruConnect staff to help “salvag[e] the platform.” In fact,
“Maximus pleaded for TruConnect’s assistance, knowing that TruConnect
personnel . . . provided the best hope for stabilizing and fixing the defective
platform.” The complaint further alleges that “TruConnect provided the
critical assistance necessary to resolve the plaintiff’s defects. In the end, both
the CPUC and Maximus expressed their gratitude for TruConnect’s work in
salvaging the defective platform.” The quantum meruit and unjust
enrichment causes of action again alleged that defendants had requested
TruConnect’s help with the platform and had benefitted from the assistance,
and that TruConnect should be reimbursed for the value that its services
conferred on defendants.
Maximus demurred to the quantum meruit cause of action on the
ground that TruConnect had not alleged that the two parties (TruConnect
24
and Maximus) had a mutual expectation or understanding that Maximus
would pay TruConnect for its services. And it demurred to the unjust
enrichment cause of action on the ground that “unjust enrichment does not
constitute a separate cause of action and is duplicative” of the cause of action
for quantum meruit, and also on the ground that TruConnect had not alleged
that the parties had a mutual expectation or understanding that Maximus
would pay TruConnect for its services. In its opposition, TruConnect argued
that Maximus should not be allowed to unjustly enrich itself at TruConnect’s
expense. It relied on City of Oakland v. Oakland Raiders (2022)
83 Cal.App.5th 458, 478 to argue that “Maximus ‘should not be permitted
unjustly to enrich [itself] at the expense of another, but should be required to
make restitution of or for property or benefits received, retained, or
appropriated, where it is just and equitable that such restitution be made,
and where such action involves no violation or frustration of law or opposition
to public policy, either directly or indirectly.’ ”
The trial court sustained the demurrer to the quantum meruit cause of
action. It concluded that the claim failed because (1) TruConnect did not
allege that defendants received a “cognizable benefit” from TruConnect’s
efforts, and (2) restitution is unavailable to a plaintiff who undertakes
measures to protect its own interests.7 As for the cause of action for unjust
enrichment, the court concluded that this was not a standalone cause of
7 The court also concluded that the allegations in the original complaint
that the CPUC promised to pay TruConnect to fix the platform were
incompatible with the amended allegations that both the CPUC and
Maximus requested help. We do not consider the allegations so inconsistent
as to defeat the cause of action. As the parties do not address this conclusion
in their appellate briefs, we need not discuss it further.
25
action and instead just a restitution claim, and that it was duplicative of the
quantum meruit cause of action.
2. Analysis.
On appeal, TruConnect argues that it properly alleged a cause of action
for “ ‘restitution’ based on unjust enrichment.” According to TruConnect, its
claims for quantum meruit and unjust enrichment both “seek restitution for
costs [it] incurred . . . in performing Defendants’ contractual obligation to
create a properly functioning platform for administering the LifeLine
program.” And the company argues that it should have been provided the
opportunity to clarify that it seeks recovery under a single restitution cause
of action. (See O’Grady v. Merchant Exchange Productions, Inc. (2019)
41 Cal.App.5th 771, 791 [even though unjust enrichment is not a cause of
action, “the term is ‘synonymous with restitution,’ which can be a theory of
recovery”]; see also Cundiff v. GTE California Inc. (2002) 101 Cal.App.4th
1395, 1405 [error to sustain general demurrer if complaint states cause of
action under any possible legal theory, and showing can be made for first
time on appeal].) But it does so under a new theory of recovery that does not
apply in these circumstances, and we reject it.
“There is no cause of action in California labeled ‘unjust enrichment.’
[Citations.] But ‘[c]ommon law principles of restitution require a party to
return a benefit when the retention of such benefit would unjustly enrich the
recipient; a typical cause of action involving such remedy is “quasi-contract.” ’
[Citations.] ‘Whether termed unjust enrichment, quasi-contract, or quantum
meruit, the equitable remedy of restitution when unjust enrichment has
occurred “is an obligation (not a true contract [citation]) created by the law
without regard to the intention of the parties.” ’ ” (City of Oakland v.
Oakland Raiders, supra, 83 Cal.App.5th at p. 477.) “ ‘Typically, the
26
defendant’s benefit and the plaintiff’s loss are the same, and restitution
requires the defendant to restore the plaintiff to his or her original position.’
[Citation.] ‘To confer a benefit,’ however, ‘it is not essential that money be
paid directly to the recipient by the party seeking restitution.’ [Citations.]
When a person has received a benefit from another, he or she is required to
make restitution ‘ “only if the circumstances of its receipt or retention are
such that, as between the two persons, it is unjust for him [or her] to retain
it.” ’ ” (Id. at p. 478.)
The briefing below, and the trial court’s ruling, both focused on the
foregoing principles. That is, they centered on whether TruConnect had
adequately alleged that it would be unjust or inequitable for defendants to
retain the benefits of the work TruConnect allegedly performed to fix
defendants’ flawed platform. On appeal, TruConnect does rely on cases that
set forth the general principle that “one who is unjustly enriched at the
expense of another is required to make restitution. [Citations.] The elements
of a cause of action for unjust enrichment are simply stated as ‘receipt of a
benefit and unjust retention of the benefit at the expense of another.’ ”
(Professional Tax Appeal v. Kennedy-Wilson Holdings, Inc. (2018)
29 Cal.App.5th 230, 238.) But its primary appellate argument is that the
court should adopt section 5 of the Restatement Third of Restitution and
Unjust Enrichment (Restatement), which recognizes a restitution cause of
action based on mistake.
“A transfer induced by invalidating mistake is subject to rescission and
restitution. The transferee is liable in restitution as necessary to avoid
unjust enrichment.” (Rest., § 5, subd. (1).) “An invalidating mistake may be
a misapprehension of either fact or law. There is invalidating mistake only
when [¶] (a) but for the mistake the transaction in question would not have
27
taken place; and [¶] (b) the claimant does not bear the risk of the mistake.”
(Id., subd. (2).) “A claimant bears the risk of a mistake when [¶] (a) the risk
is allocated to the claimant by agreement of the parties; [¶] (b) the claimant
has consciously assumed the risk by deciding to act in the face of a recognized
uncertainty; or [¶] (c) allocation to the claimant of the risk in question
accords with the common understanding of the transaction concerned.” (Id.,
§ 5(3).)
TruConnect claims on appeal that its performance of defendants’
contractual obligation to the CPUC was induced by defendants’ and the
CPUC’s request for help, as well as TruConnect’s mistaken belief that the
CPUC would pay the company for its work. It claims this amounted to an
“invalidating mistake” (Rest., § 5, subd. (2)) entitling the company to
restitution. But a review of the Restatement’s illustrations reveals the
foregoing sections are not aimed at situations presented by the facts in this
case. Instead, they address situations where mistakes are based on matters
that were truly unknown.8 Again, section 5, subdivision (2), provides that
there is an invalidating mistake only when (a) the transaction would not
have taken place “but for the mistake” and (b) the claimant did not bear the
risk of the mistake. TruConnect claims that the first element is satisfied
8 For example, one contemplates that restitution would be owed if a life
insurance company paid the policy limit to a beneficiary after an insured was
believed to be dead in a shipwreck, but was later found to be alive. (Rest.,
§ 5, com. b, illus. 1, p. 49.) The insurance company’s payment would be
considered “the result of an invalidating mistake,” and it would have a claim
in restitution. (Ibid.) Another illustration contemplates a tax authority
mistakenly assessing Blackacre for improvements that are actually located
on Whiteacre, and the owner of Blackacre pays the tax bill believing that the
property has been correctly assessed. (Rest., § 7, com. b, illus. 1, p. 80.) The
Blackacre owner would have a claim in restitution against the Whiteacre
owner to recover taxes paid in respect of Whiteacre. (Ibid.)
28
because it “was induced to perform by the mistaken belief that it would be
paid.” But even assuming that the CPUC induced TruConnect to help by
promising to pay, the company’s “mistaken belief” it would be reimbursed
does not mean that “but for the mistake the transaction in question would
not have taken place,” for purposes of the Restatement, section 5,
subdivision (2)(a). TruConnect’s complaint itself alleges that the company
devoted resources to fixing the platform “to mitigate damages resulting from
Defendants’ negligence in designing and launching the defective
platform”―an indication at least some work was taken for its own benefit.
Moreover, belief is a subjective condition, unlike the objective facts set forth
in the sorts of contractual relationships addressed in section 5 of the
Restatement. And any mistaken belief it would be paid for its work was
because the CPUC allegedly promised to pay TruConnect, not defendants.
Because TruConnect does not allege that it had any sort of formal contract
with defendants governing its work on the new database, there is no
“invalidating mistake” here.
As for the second element―the claimant not bearing the risk of the
mistake―section 5 of the Restatement provides that the claimant does bear
the risk when (a) the parties’ agreement allocates the risk to claimant,
(b) “the claimant has consciously assumed the risk by deciding to act in the
face of a recognized uncertainty,” or (c) “allocation to the claimant of the risk
in question accords with the common understanding of the transaction
concerned.” (Rest., § 5, subd. (3).) TruConnect claims that none of these
three elements apply, and thus it did not bear the risk of mistake. Again,
though, TruConnect has not identified any objective mistake of fact or law
that amounts to an “invalidating mistake” for purposes of section 5. The
company states that it “was not party to an express or implied agreement
29
allocating the risk that it would not be paid for its services,” citing
comment b(1). (Rest., § 5, com. b(1), p. 48.) But that comment focuses on
situations where parties settle disputes without necessarily knowing all the
relevant facts. True enough, no one claims the parties here were operating
under a settlement agreement. But the fact there was no formal agreement
between TruConnect and defendants suggests TruConnect “assumed the risk
by deciding to [provide assistance] in the face of recognized uncertainty” that
defendants would ultimately provide reimbursement―meaning there was no
“invalidating mistake.” (Rest., § 5, subd. (3)(b).)
At oral argument, counsel for TruConnect relied heavily on section 7 of
the Restatement, which provides that the “[m]istaken performance of
another’s obligation gives the performing party a claim in restitution against
the obligor to the extent of the benefit mistakenly conferred on the obligor.”
(Boldface omitted.) This section “describes one form of unjust enrichment
arising by mistake in a three-party setting,” where a party (A) induced by an
“invalidating mistake” described in section 5 performs a second party’s (B’s)
obligation to a third party (C), which confers a benefit on the second party (B)
to the extent that party’s enforceable obligation to the third party (C) is
reduced. (Rest., § 7, com. a, p. 79.) Again, though, this section does not fit
the facts presented here since there was no “invalidating mistake.” Counsel
directed the court at argument to illustration 8, where “A and B are
separately employed to perform specified services for C. Misunderstanding
the scope of their respective contractual obligations, and unknown to B or C,
A performs services that B is obligated to perform and for which B is being
compensated by C. A has a claim in restitution against B to the extent that B
has realized a benefit from A’s mistaken performance. The benefit to B is
measured by B’s saved expenditure, not by A’s expenditure or by C’s payment
30
under contract for the services in question.” (Rest., § 7, com. c, illus. 8, p. 82,
italics added.) Here, TruConnect’s provision of assistance was alleged to
have been known to all parties. And while there may have been a mistake
over whether the CPUC would reimburse TruConnect for its assistance, there
was not alleged to be any mistake over the scope of the parties’ respective
duties.
In its order sustaining the demurrer, the trial court noted that a party
seeking reimbursement under a theory of quantum meruit “ ‘must show the
circumstances were such that “. . . services were rendered under some
understanding or expectation of both parties that compensation therefor was
to be made,” ’ ” relying on County of Santa Clara v. Superior Court (2023)
14 Cal.5th 1034, 1049–1050. TruConnect now argues this was error since “a
mutual understanding is not required for restitution based on benefit
conferred by mistake”―an issue the trial court was not asked to address and
was not an issue in County of Santa Clara. (Italics added.)
As with TruConnect’s negligence cause of action, we are sympathetic to
allegations that the company spent millions but has no legal remedy. But it
has apparently abandoned its theory that defendants owe restitution because
they were unjustly enriched, and the company has not established on appeal
that defendants owe restitution because it could expect reimbursement based
on mistaken enrichment. We therefore reject TruConnect’s argument that it
stated a valid restitution cause of action.
C. The Court Need Not Reach the Issue of Whether the CPUC Is a
Necessary and Indispensable Party to this Action.
As we have said, the trial court concluded that the CPUC was not a
necessary or indispensable party to this lawsuit and overruled Solix’s
demurrer on that ground. Defendants argue that the trial court was
31
mistaken, that this court should conclude that the CPUC is a necessary and
indispensable party, and that this is a separate and independent basis to
affirm the judgment. Because we have concluded that TruConnect’s
complaint did not state a valid claim for relief, we need not reach this issue.
III.
DISPOSITION
The judgment is affirmed. Defendants are entitled to their appellate
costs.
32
_________________________
Humes, P. J.
WE CONCUR:
_________________________
Banke, J.
_________________________
Smiley, J.
TruConnect Communications, Inc. v. Maximus Inc. et al. A172474
33
Trial Court: San Francisco Superior Court
Trial Judge: Hon. Ethan P. Schulman
Counsel:
Bird, Marella, Rhow, Lincenberg, Drooks & Nessim, LLP, Thomas R.
Freeman, Julia B, Cherlow, Monique M. Candiff for Plaintiff and Appellant.
Orric, Herrington & Sutcliffe LLP, Cynthia J. Larsen for Respondent Solix,
Inc,
Jones Day, Nathaniel P. Garrett for Respondent. Maximus Inc.
California Public Utilities Commission, Christine J. Hammond, Jonathan
Koltz, Travis T. Foss as Amicus Curiae on behalf of Respondent.
TruConnect Communications, Inc. v. Maximus Inc. et al. A172474
34