Fear Not Law CA Unpub Decisions

Menifee Neighbors Care v. City of Menifee CA4/2

Filed 9/21/26 Menifee Neighbors Care v. City of Menifee CA4/2
CA Unpub Decisions

Filed 9/21/26 Menifee Neighbors Care v. City of Menifee CA4/2
NOT TO BE PUBLISHED IN OFFICIAL REPORTS

California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
or ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FOURTH APPELLATE DISTRICT

DIVISION TWO

MENIFEE NEIGHBORS CARE,

Plaintiff and Appellant, E086831

v. (Super. Ct. No. CVRI2403156)

CITY OF MENIFEE, OPINION

Defendant and Respondent;

MISTER CAR WASH et al.,

Real Parties in Interest and Respondents.

APPEAL from the Superior Court of Riverside County. Harold W. Hopp, Judge.

Reversed.

Carstens, Black & Minteer, and Douglas P. Carstens; Klapach & Klapach and

Joseph S. Klapach, for Plaintiff and Appellant.

Allen Matkins Leck Gamble Mallory & Natsis, Jonathan E. Shardlow, Heather S.

Riley, for Real Parties in Interest and Respondents.

1
Rutan & Tucker, Jeffrey T. Melching, and Robert O. Owen, for Defendant and

Respondent.

I.

INTRODUCTION

Respondents Mister Car Wash and Trevor Buhl proposed building a daycare and

car wash (the Project) on a vacant lot in the City of Menifee. In approving the Project,

the City found that it was exempt from review under the California Environmental

Quality Act (CEQA; Pub. Resources Code, § 21050 et seq.). Appellant Menifee

Neighbors Care (MNC) filed a petition for a writ of mandate challenging the approval,

arguing that the Project was not exempt from CEQA because it would have significant

environmental effects in the form of noise and traffic impacts. The trial court found that

the Project was exempt from CEQA and denied the petition. We reverse.

II.

FACTUAL AND PROCEDURAL BACKGROUND

Buhl, on behalf of Mister Car Wash, applied for a permit to build the Project. The

proposed Project combined an automated car wash and an adjoining daycare facility,

along with landscaping and a parking lot.

The City’s Planning Commission approved the Project. In doing so, it found that

the Project was categorically exempt from CEQA review under the “Class 32” categorical

exemption for infill development, in part because it would have no significant

2
environmental impacts as to noise or traffic. (See CEQA Guidelines, tit. 14, div. 6, ch, 3,
1
§ 15332.) MNC appealed the decision to the City Council.

The City held a public hearing on MNC’s appeal during which MNC voiced its

concerns about the Project. MNC argued the Project did not qualify for a Class 32

exemption because of its noise and traffic impacts. The City denied MNC’s appeal and

approved the Project, finding that it qualified for a Class 32 exemption.

MNC then filed a petition for a writ of mandate in the trial court. MNC argued,

among other things, that the Project did not qualify for a Class 32 exemption because of

its noise and traffic impacts. MNC further argued that the City improperly “mitigated the

Project into a Class 32 exemption” because the Project, as approved, proposed a sound

wall designed to reduce the car wash’s noise impacts on the daycare.

The trial court denied MNC’s petition. MNC timely appealed.

1
“Class 32 consists of projects characterized as in-fill development meeting the
conditions described in this section. [¶] (a) The project is consistent with the applicable
general plan designation and all applicable general plan policies as well as with
applicable zoning designation and regulations. [¶] (b) The proposed development occurs
within city limits on a project site of no more than five acres substantially surrounded by
urban uses. [¶] (c) The project site has no value, as habitat for endangered, rare or
threatened species. [¶] (d) Approval of the project would not result in any significant
effects relating to traffic, noise, air quality, or water quality. [¶] (e) The site can be
adequately served by all required utilities and public services.” (Cal. Code Regs. Tit. 14,
§ 15332.)

3
III.

DISCUSSION

A. Applicable Law and Standard of Review

“CEQA requires an agency proposing to approve or carry out a project to prepare a

document called an environmental impact report, or an EIR, if the project ‘may have a

significant effect on the environment.’” (We Advocate Through Environmental Review v.

County of Siskiyou (2022) 78 Cal.App.5th 629, 635.) But there are “classes of projects

that generally do not have a significant effect on the environment and therefore may be

exempted from CEQA review.” (Committee to Save The Hollywoodland Specific Plan v.

City of Los Angeles (2008) 161 Cal.App.4th 1168, 1186.) A “Class 32” exemption for

“in-fill development” applies when, among other conditions not relevant here, approval

of the project “would not result in any significant effects relating to traffic, noise, air

quality, or water quality.” (CEQA Guidelines, § 15332, subd. (d).)

“On appeal from denial of a petition for writ of administrative mandamus, we

review the agency’s decision, not the superior court’s, to determine whether the agency

has prejudicially abused its discretion. [Citation.] An abuse of discretion is established if

the agency has not proceeded in a manner required by law or if the determination is not

supported by substantial evidence. [Citations.] We exercise our independent judgment to

determine whether the agency employed proper procedures and review the agency’s

factual findings for substantial evidence.” (Arcadians for Environmental Preservation v.

City of Arcadia (2023) 88 Cal.App.5th 418, 428.) We likewise “review an agency’s

4
factual determination that a project falls within a statutory or categorical CEQA

exemption for substantial evidence.” (West Adams Heritage Association v. City of Los

Angeles (2024) 106 Cal.App.5th 395, 410.)

B. Analysis

We conclude the City’s finding that the Project qualifies for a Class 32 exemption

was unsupported for two principal reasons, both of which relate to the car wash’s noise

impacts on the daycare. These two errors individually and cumulatively require reversal.

We first reject Respondents’ argument that MNC forfeited its challenges to the

trial court’s decision by submitting on the court’s tentative decision because MNC

advances the same arguments on appeal as in the trial court, which the trial court

considered and rejected. (See Parkford Owners for a Better Community v. Windeshausen

(2022) 81 Cal.App.5th 216, 226; Lindsay v. Patenaude & Felix APC (2024) 107

Cal.App.5th 335, 343-344.)

We next reject Respondents’ argument that the car wash’s noise impacts on the

daycare cannot be significant as a matter of law because a Project cannot have significant

impacts on its own users. The argument is foreclosed by our Supreme Court’s decision in

California Building Industry Association v. Bay Area Air Quality Management District

(2015) 62 Cal.4th 369 (CBIA).

There, the Supreme Court granted review to decide whether CEQA requires an

analysis of how “existing environmental conditions” at a project site “will impact future

residents or users” of the project. (CBIA, supra, 62 Cal.4th at p. 381.) The Court

5
explained that the environment’s effects on a project need not be considered, but CEQA

mandates “an analysis of how a project might exacerbate existing environmental

hazards.” (Id. at p. 392.) The Court reasoned that, because CEQA’s “core requirement”

is for an agency to study a “project’s impacts on the environment—how a project might

worsen existing conditions,” requiring an agency “to evaluate how such worsened

conditions could affect a project’s future users or residents is entirely consistent with

CEQA.” (Id. at p. 389, italics added.) So “when a proposed project risks exacerbating []

environmental hazards or conditions that already exist, an agency must analyze the

potential impact of such hazards on future residents or users.” (Id. at p. 377.)

In short, CBIA held that CEQA requires an analysis of how potentially significant

environmental conditions exacerbated by a project may affect its own “future users or

residents.” Here, for instance, the City was not required to study the impact of

preexisting noise levels on its future users or residents. But it was required to study how

the Project’s operation could exacerbate those noise levels and the resulting noise impacts

on the Project’s users, including those at the daycare. (CBIA, supra, 62 Cal.4th at p. 381;

Clews Land and Livestock, LLC v. City of San Diego (2017) 19 Cal.App.5th 161, 193-194

[noting that, under CBIA, agency would have to study fire hazards to project’s livestock,

personnel, and clients if exacerbated by the project]; see also cf. Tiburon Open Space

Committee v. County of Marin (2022) 78 Cal.App.5th 700, 770, fn. 37 [rejecting

6
argument that agency need not study a project’s increased fire risks because those risks
2
are “only impacts on the Project itself, not impacts on the environment”].)

The City thus properly decided to study the effects of the Project’s car wash on the
3
daycare’s users, but its analysis was flawed.

An agency must decide whether a project is categorically exempt “without

reference to or reliance upon any proposed mitigation measures.” (Salmon Protection &

Watershed Network v. County of Marin (2004) 125 Cal.App.4th 1098, 1106 (Salmon

Protection); accord, Azusa Land Reclamation Co. v. Main San Gabriel Basin

Watermaster (1997) 52 Cal.App.4th 1165, 1199-1200 (Azusa Land).) Thus, an agency

2
To support its argument that CBIA held that CEQA does not require an agency
to study a project’s effect on its own users, Respondents cite three cases purportedly
“applying CBIA,” but all three predate CBIA. (Ballona Wetlands Land Trust v. City of
Los Angeles (2011) 201 Cal.App.4th 455, 474; South Orange County Wastewater
Authority v. City of Dana Point (2011) 196 Cal.App.4th 1604; City of Long Beach v. Los
Angeles Unified School District (2009) 176 Cal.App.4th 889. Needless to say, these
cases did not apply a decision that did not yet exist. More to the point, when discussing
these cases, Respondents entirely ignore CBIA’s holding that requiring an agency to
study how a project’s impacts might affect its future users or residents “is entirely
consistent with CEQA.” (CBIA, supra, 62 Cal.4th at p. 389.)
3
We reject Respondents’ argument that MNC forfeited its argument that the
Project does not qualify for a Class 32 exemption in part because its noise impacts would
violate the City’s 65-decibel limit in the Development Code. MNC unambiguously made
this argument below in its opening and reply briefs. The trial court in turn addressed the
issue, finding that the project would not have significant noise impacts because its
operation “will not exceed the City’s applicable exterior noise limits” of 65 decibels.
More importantly, the City never disputed below that the 65-decibel level was the
applicable threshold to assess whether noise impacts would be significant. The City
instead argued in its opposition below that the project would not violate the 65-decibel
threshold, which it deemed “the applicable noise limitation[].”

7
may not rely on a mitigation measure to support a categorical exemption. (Salmon

Protection, supra, at p. 1102; Azusa Land, supra, at pp. 1199-1200.)

In Salmon Protection, a county found that a residential construction project might

have potential adverse impacts on adjacent stream habitat, but the county adopted

numerous conditions expressly to mitigate the impacts and qualify the project for a

categorical exemption. (Salmon Protection, supra, 125 Cal.App.4th at p. 1104.) The

Court of Appeal noted that mitigation measures are only proper at later stages of the

CEQA process, which the county improperly evaded by prematurely adopting mitigation

measures to classify the project as exempt. (Ibid.)

In Azusa Land, an agency approved continued disposal of waste at a landfill that

was leaking pollutants. (Azusa Land, supra, 52 Cal.App.4th at p. 1176.) The agency

nonetheless found the project exempt from CEQA because it found that mitigation

measures would prevent further pollution. (Ibid.) The Court of Appeal held the agency

erred because it improperly relied on mitigation measures to find the project exempt. (Id.

at p. 1199.) This is because “proposed mitigation measures cannot be used to support a

categorical exemption; they must be considered under the standards that apply to a

mitigated negative declaration.” (Ibid.)

This case involves circumstances much like those in Salmon Protection and Azusa

Land—two cases MNC relies on heavily, yet Respondents ignore entirely.

8
In April 2024, Respondents obtained a Noise Impact Analysis (April NIA) report

that evaluated the car wash’s noise impacts on the daycare. Under a section entitled

“Cumulative Impact Assessment,” the report stated: “Unmitigated noise levels generated
4
by the car wash operations would cause noise levels to exceed 65 [decibels ] at the

proposed day care to the west. Because noise levels exceed the applicable criteria of 65
5
[decibels], project operations would constitute a noise impact.” In the next section,

entitled “Noise Reduction Measures,” the report continues: “Due to an expected noise

exceedance of 65 [decibels] to the west, noise reduction features in the form of [a] sound

wall at the exit of the car wash tunnel was evaluated. . . . [N]oise levels from the car

wash operations at the surrounding sensitive land uses, with the incorporation of an 8-

foot-high wall along the car wash tunnel’s exit, would be below 65 [decibels] and would

be in compliance with the desired noise criteria.” The report concluded that “[w]ith the

construction of the . . . noise wall . . . [the] noise levels . . . would be less than significant

and comply with the City’s noise standards.”

4
The technical sound measurement is “dBA Leq.” “Decibels are the units of
measurement for sound intensity. Because knowing a sound’s decibel level does not in
itself adequately characterize how humans perceive the sound, the sound is often
described in terms of A-weighted decibels — which, unlike unweighted decibels, account
for the human ear’s varying sensitivity to different frequencies. To account for varying
sound levels over time, the sound is also often described in terms of the A-weighted
equivalent sound level [Leq]— which represents the average sound level over a specified
period — and in terms of the A-weighted maximum sound level — which represents the
highest sound level over a specified period.” (Sierra Watch v. County of Placer (2021)
69 Cal.App.5th 86, 107, fn. 6.) For brevity’s sake, we use “decibels.”

[footnote continued on next page]

9
Respondents obtained a revised Noise Impact Analysis report in May 2024 (May

NIA). The May NIA focused only on the daycare’s outdoor playground area. Under the

“Cumulative Impact Assessment” section, the report states: “Noise levels generated by

the car wash operations would not cause noise levels to exceed 65 [decibels] at the

playground area of the proposed day care to the west. Because noise levels would not

exceed the applicable criteria of 65 [decibels] at the playground area, project operations

would not constitute a noise impact.” The “Noise Reduction Measures” section states:

“Notwithstanding the absence of a significant noise impact, a noise reduction feature in

the form of a sound wall at the exit of the car wash tunnel was evaluated. . . . [W]ith the

addition of [the] wall . . . noise levels for the entire day [c]are center building would be

below 65 [decibels].” The report concluded: “The proposed project would not generate

on-site stationary noise from car wash operations resulting in noise levels above 65

[decibels] at the playground area of the day care . . . . Notwithstanding, to further reduce

the potential for noise, [Respondents] will construct a 8-foot-high noise wall at the car

wash tunnel exit.”

Both NIAs thus explicitly provide that exceeding the 65-decibel threshold in the

City’s Development Code is a significant noise impact under CEQA, and both make clear

5
The “applicable criteria of 65 [decibels]” comes from section 9.210.060,
subdivision (D) of the City’s Development Code, which provides: “No person shall
create any sound, or allow the creation of any sound, on any property that causes the
exterior and interior sound level on any other occupied property to exceed the sound level
standards set forth in Table 9.210.060-1, Stationary Source Noise Standards.” That Table
then provides that exterior sound levels may not exceed 65 decibels.

10
that the sound wall was proposed as a mitigation measure. The April NIA notes that the

“unmitigated noise levels” caused by the car wash would exceed 65 decibels, but that a

“noise reduction feature” in the form of a sound wall would reduce the noise to under 65

decibels. The May NIA similarly noted that noise levels from the car wash would be

under 65 decibels for the entire daycare “with the addition of the sound wall.” Both

reports discuss the sound wall under a section entitled “Noise Reduction Measures.”

Under CEQA, a mitigation measure includes any effort “minimizing” a significant

impact “by limiting [its] degree or magnitude.” (CEQA Guidelines, § 15370; see also

Citizens for Environmental Responsibility v. State ex rel. 14th Dist. Ag. Association

(2015) 242 Cal.App.4th 555, 569.) The sound wall was explicitly proposed in both the

April NIA and May NIA as a “Noise Reduction Measure” designed to reduce the car

wash’s noise to under 65 decibels at the daycare—in other words, to mitigate the noise to

a less-than-significant level. We fail to see how the sound wall could be anything other

than a mitigation measure. (See Lotus v. Department of Transportation (2014) 223

Cal.App.4th 645, 656, fn. 8 [plant and tree-related measures adopted to “reduce or

eliminate” an environmental impact caused by a highway “plainly mitigation measures

and not part of the project itself”].)

Respondents unpersuasively argue the sound wall is a “project design feature,” not

a mitigation measure. In support, they cite Save the Plastic Bag Coalition v. City and

County of San Francisco (2013) 222 Cal.App.4th 863 (Plastic Bag), and Wollmer v. City

of Berkeley (2011) 193 Cal.App.4th 1329. Neither case helps Respondents.

11
In both cases, the challenged project contained a design feature that was proposed

to help alleviate a pre-existing environmental issue. In Plastic Bag, the design feature

was a 10-cent per bag fee in a city ordinance intended to “address[] the problem of

single-use bags, a problem that preexisted the proposed project.” (Plastic Bag, supra,

222 Cal.App.4th at p. 882.) In Wollmer, the project proposed a bike lane, which

improved a preexisting traffic problem at the project site “for the benefit of the

community.” (Wollmer v. City of Berkeley, supra, 193 Cal.App.4th at p. 1353.) Thus, in

both cases, the challenged project design feature did not mitigate an environmental

impact caused by the project, but instead ameliorated an already existing environmental

issue. (See also Citizens for Environmental Responsibility v. State ex rel. 14th Dist. Ag.

Assn., supra, 242 Cal.App.4th at p. 569 [project’s manure management plan was not a

mitigation measure because it was “a preexisting measure previously implemented to

address a preexisting concern”].)

That is not the case here. The project’s sound wall was expressly proposed to

lessen (mitigate) the noise impacts of the carwash—after the carwash had been

designed—so that its noise levels would be below the City’s 65-decibel limit. The sound

wall is thus a mitigation measure, not just a project design feature, as Respondents

contend. (See Berkeley Hills Watershed Coalition v. City of Berkeley (2019) 31

Cal.App.5th 880, 893, fn. 9 [project design features proposed “to meet building code

requirements” and to “address preexisting conditions on the site” were not mitigation

measures]; Berkeley Hillside Preservation v. City of Berkeley (2015) 241 Cal.App.4th

12
943, 961 [traffic management plan proposed for construction of a home was not a

mitigation measure because it was not “proposed subsequent action taken to mitigate any

significant effect of the project”]; see also Lincoln Place Tenants Assn. v. City of Los

Angeles (2007) 155 Cal.App.4th 425, 445 [“A ‘mitigation measure’ is a suggestion or

change that would reduce or minimize significant adverse impacts on the

environment caused by the project as proposed,” italics added].)

An agency may not circumvent CEQA by adopting mitigation measures to qualify

a project for a categorical exemption. (Salmon Protection, supra, 125 Cal.App.4th at p.

1106.) That is what the City did here. This alone warrants reversal.

Respondents argue the sound wall is not a mitigation measure because the City

found there was “no significant noise impact in the first instance,” so “there was no

significant noise impact to mitigate.” This leads us to a second critical flaw in the City’s

analysis.

Respondents contend that, in finding no significant noise impacts, the City

properly relied on the May NIA, which found that the car wash’s operation will not

exceed 65 decibels at the daycare’s playground area. They contend the City had

discretion to focus on noise levels at the playground, where “sensitive receptors”

(children) would be present for long periods of time instead of other areas where people

would be present only intermittently and for short periods.

13
But the City’s Development Code’s 65 decibel-limit does not apply only to select

portions of an occupied building’s exterior. It applies to “the exterior . . . on any other

occupied property,” without qualification. It is thus immaterial that the playground

would not be subjected to 65-plus decibels of noise because the 65-plus decibel noise

impacts on other parts of the daycare would nonetheless violate the Development Code.

We agree with Respondents that a violation of the City’s Development Code’s

noise limits (or any other noise limit regulation) is not per se substantial evidence of a

significant environmental effect. (See Krovoza v. City of Davis (2025) 117 Cal.App.5th

623, 638-639.)

But, according to the City, the Project would create significant noise impacts if

noise from its operation exceeds 65 decibels. Again, the April NIA says the project’s

“operations would constitute a significant noise impact.” The May NIA, on the other

hand, says its operations would not constitute a significant noise impact “[b]ecause noise

levels would not exceed the applicable criteria of 65 [decibels] at the playground area.”

The City thus argued below that there would be no significant noise impacts because the

project would not violate the 65-decibel limit (at the daycare).

Thus, by the City’s own standards and evidence in this case, the Project’s noise

impacts will be significant if they exceed 65 decibels. As explained, the Project’s noise

impacts will exceed that threshold at areas other than the playground, even with the

14
6
sound wall, thereby creating significant noise impacts. (See We Advocate Through

Environmental Review v. County of Siskiyou, supra, 78 Cal.App.5th at p. 695.) This is a

second reason why the Project does not qualify for a Class 32 exemption and provides a

second ground for reversal. (See CEQA Guidelines, § 15332, subd. (d).)

For the foregoing reasons, we conclude the City improperly found the Project is

exempt from CEQA analysis as a Class 32 project. We thus need not and do not address

MNC’s arguments concerning the project’s traffic impacts. (See Koi Nation of Northern

California v. City of Clearlake (2025) 109 Cal.App.5th 815, 823; Marina Coast Water

District v. County of Monterey (2023) 96 Cal.App.5th 46, 65 fn. 17.)

6
At oral argument, Respondents noted for the first time that the City’s
Development Code provides that the “Noise Control Regulations” chapter is “not
intended to establish thresholds of significance for the purpose of any analysis required
by the California Environmental Quality Act (CEQA), and no such thresholds are hereby
established.” (Menifee Dev. Code, § 9.210.060, subd. (A).) The City also emphasized
lead agencies have “substantial discretion in determining the appropriate threshold of
significance to evaluate the severity of a particular impact” (King & Gardiner Farms,
LLC v. County of Kern (2020) 45 Cal.App.5th 814, 884.) But, again, the City’s own
evidence (the NIAs) states that, at least for the project’s purposes, noise impacts above 65
decibels are significant. The City cannot now argue otherwise, particularly given their
argument below that the Project will not have significant noise impacts because its
operation will not create noise above 65 decibels. (See We Advocate Through
Environmental Review v. County of Siskiyou, supra, 78 Cal.App.5th at pp. 694-695 [lead
agency cannot say threshold is significant then say project’s impacts exceeding that
threshold are insignificant].)

15
IV.

DISPOSITION

The judgment is reversed. The matter is remanded and the trial court is instructed

to issue a writ of mandate directing the City to set aside its finding that the Project

qualifies for a Class 32 exemption. MNC may recover its costs on appeal.

NOT TO BE PUBLISHED IN OFFICIAL REPORTS

CODRINGTON
J.

We concur:

McKINSTER
Acting P. J.

MILLER
J.

16

← Back to CA Unpub Decisions · Knowledge Base
Lean view · served in 2 ms · full site view